Issue |
MATEC Web Conf.
Volume 311, 2020
IX Czarnowski Readings – Annual International Scientific and Practical Conference on the Organization of Production and Industrial Policy
|
|
---|---|---|
Article Number | 02004 | |
Number of page(s) | 10 | |
Section | Section Meetings | |
DOI | https://doi.org/10.1051/matecconf/202031102004 | |
Published online | 23 March 2020 |
Problems of developing the model for forming parent machine-building enterprise order portfolio under cooperation conditions
1 Professor, Doctor of Economic Sc., Bauman University, Moscow
2 Postgraduate Bauman University, Moscow
The article deals with the feature’s projects portfolio formation of head enterprise that produces high-tech products. Methods the projects portfolio formation are considered: mathematical, simulation and economic-statistical. The factors that influence the choice of the model are illustrated.It is proposed to carry out research on the basis of creation complexes ofinterrelated, multi-level models and optimization-simulation approach. Themeans of implementing this approach are human-machine iterative,interactive procedures. To find the optimal solution by the decision maker,procedures should be based on the identification of the main goals andpreferences used in the creation of an optimal of the project portfolio, thestudy of a set of acceptable parameters and actions.
The head enterprise is considered as a complex system described by severalmodels, to which the control scheme with direct and feedback is applicable,where:
functional breakdown of the process of forming the projects portfolio into separate blocks justifies the use of multi-level modeling of a complex production system;
in long-term planning and forecasting, it is necessary to solve both the direct problem of system consequences for a given “input”, and the inverse problem of planning, which has a significant spread of output parameters. In order to optimize the method, it is proposed to create iteration- optimization analytical models using the two-point boundary value method, including planning from the achieved and planning from the final result. Indicated the advantages of using a specialized mathematical apparatus inthe formation of the projects portfolio.
Key words: organization of production / project portfolio / head enterprise / management scheme / planning purposes / multi-level modeling / iterative-optimization analytical model / two-point limited value method
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.