Open Access
Issue
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
Article Number 02008
Number of page(s) 5
Section Part 2: Internet +, Big data and Flexible manufacturing
DOI https://doi.org/10.1051/matecconf/201710002008
Published online 08 March 2017
  1. Cao Hai’ou, Zheng Jianyong, Cai Yueming. Study of substation automation communication system based on CAN bus. Proceedings of the CSUEPSA. 2002, 14(6): 24–26. (in Chinese). [Google Scholar]
  2. Liu Yan, Qin Wen. Design of communication network for integrated substation automation system based on CAN field-bus). Relay, 2007, 35(18): 54–56. (in Chinese). [Google Scholar]
  3. Zhu Huawei, Wu Ailian, Rufeng Yang, et al. Design of CAN field bus communication adapter for transformer station. Proceedings of the CSUEPSA. 2005, 17(5): 86–89. (in Chinese). [Google Scholar]
  4. Zhang Zhizhe, Li Xingyuan, Cheng Shijie. Structures functions and implementation of united information system for smart grid. Proceedings of the CSEE, 2010, 30(34): 1–7. (in Chinese).(in Chinese). [Google Scholar]
  5. Lin Chuang, Shan Zhiguang, Ren Fengyuan. Quality of service for computer networks. Beijing: Tsinghua University Press, 2004: 174–177. (in Chinese). [Google Scholar]
  6. Miao Xin, Zhang Kai, Shiming Tian, et al. Information communication system supporting smart grid. Power System Technology, 2009, 33 (17): 8–13. (in Chinese). [Google Scholar]
  7. Dong Zhangzhu, Tang Ming, Li Ning. Network Management in Master Station of Electric Power Systems Dispatch. Power System Protection and Control, 2008, 36 (18): 62–64. (in Chinese). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.