Volume 87, 2017
The 9th International Unimas Stem Engineering Conference (ENCON 2016) “Innovative Solutions for Engineering and Technology Challenges”
|
|
---|---|---|
Article Number | 01001 | |
Number of page(s) | 7 | |
Section | Civil Engineering | |
DOI | https://doi.org/10.1051/matecconf/20178701001 | |
Published online | 12 December 2016 |
- Chung, L. P. (2006). Implementation Strategy for Industrialized Building System. Johor. [Google Scholar]
- Construction Industry Development Board (CIDB). (2006). Construction Industry Master Plan 2006-2015 (CIMP 2006–2015). [Google Scholar]
- Construction Industry Development Board (CIDB). (2010). IBS Road Map, (72). [Google Scholar]
- Construction Industry Development Board (CIDB). (2015a). Construction Industry Master Plan 2 (CIMP 2 2016-2020), (January 2015). [Google Scholar]
- Construction Industry Development Board (CIDB). (2015b). Construction Industry Transformation Programme 2016 – 2020. Kuala Lumpur. [Google Scholar]
- Construction Industry Development Board (CIDB). (2015c). Input-Output Table. [Google Scholar]
- Construction Research Institute of Malaysia (CREAM). (2011). Proceedings of 1st IBS Roundtable Workshop. Vasa, 19. Retrieved from http://medcontent.metapress.com/index/A65RM03P4874243N.pdf [Google Scholar]
- Department of Statistics. (2013). Ecomonic Census of Contruction. [Google Scholar]
- Gibb, A. G. F. (2001). Pre-assembly in Construction: A review of recent and current industry and research initiatives on pre-assembly in construction In Construction Research & Innovation Strategy Panel CRISP Consultancy Commission 00/19. London. [Google Scholar]
- Halil, F. M. (2015). Sustainable value tfirough the implementation of strategic partnering in dtdustrialised Building System (IBS). In International Symposium in Developing Economies : Commonalities Among Diversities (pp. 188–200). [Google Scholar]
- Haron, N.A. Hassim, S. Kadir, M. R.A., Jaafar, M. S. (2005). Building Costing Comparison Between Conventional and Framework System. Journal of Technology, (43(B)). [Google Scholar]
- Hussein, T. S. J. (2007). Industrialised Building System: The Challenges and Way Forward. Construction Industry Research Achievements International Conference, (Ciraic), 1–12. [Google Scholar]
- Kamar, K. A. M., Alshawi, M. and Hamid, Z. A. (2009). Barriers to industrialized building system (IBS): the case of malaysia. In 9th International Postgraduate Research Conference (IPGRC). United Kingdom. [Google Scholar]
- Kamaruddin, S., Mohammad, M., Mahbub, R., & Yunus, R. (2013). Perception Towards Cost Implication of Mechanisation and Automation Approcah in IBS Projects in Malaysia. 29th Annual ARCOM Conference, (September 2013), 213–222. [Google Scholar]
- Kamaruddin, S. S., Mohammad, M. F., & Mahbub, R. (2013). Enhancing the Quality of Life by Adopting IBS: An Economic Perspective on Mechanisation and Automation. Procedia – Social and Behavioral Sciences, 101, 71–80. doi:10.1016/j.sbspro.2013.07.180 [CrossRef] [Google Scholar]
- Kamarul Anuar Mohamad Kamar, Mustafa Alshawi, Zuhairi Abd. Hamid, Mohd Nasrun Mohd Nawi, Ahmad Tarmidzi Haron, M. R. A. (2009). Industrialised Building System (IBS): A Review of Experiences in Uk and Malaysian Construction Industry. 2nd Construction Industry Research Achievement International Conference (CIRAIC), 1–12. [Google Scholar]
- Mohammad, M. F. (2013). Construction Environment: Adopting IBS Construction Approach Towards Achieving Sustainable Development. Procedia - Social and Behavioral Sciences, 85, 8–15. doi:10.1016/j.sbspro.2013.08.332 [CrossRef] [Google Scholar]
- Mohammad, M. F., Saifuza, A., Shukor, A., Mahbub, R., & Halil, F. M. (2014). Challenges in the Integration of Supply Chains in IBS Project Environment in Malaysia. Procedia - Social and Behavioral Sciences, 153, 44–54. doi:10.1016/j.sbspro.2014.10.039 [CrossRef] [Google Scholar]
- Musa, M. F., Mohammad, M. F., Yusof, M. R., & Mahbub, R. (2015). The Way Forward for Industrialised Building System (IBS) in Malaysia, (MAY). doi:10.1007/978-981-287-290-6 [Google Scholar]
- Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2011). A critical literature review on the concept of team integration in industrialized building System (IBS) project. Malaysian Construction Research Journal, 9(2), 1–17. [Google Scholar]
- Sarja, A. (1998). Open & Industrialised Building, CIB (the International Council for Building Research Studies and Documentation). [Google Scholar]
- Shukor, A. S. A., Mohammad, M. F., & Mahbub, R. (2011). Supply Chain Integration Challenges in Project Procurement. Management and Innovation for a Sustainable Built Environment, (June). [Google Scholar]
- The UK government Department of Trade and Industry (DTI). (2004). Modern methods of construction in Germany – playing the off-site rule In Global Watch Mission Report. United Kingdom. [Google Scholar]
- Yusof, M. R., Nawawi, A. H., Mohammad, M. F., & Musa, M. F. (2014). Key Success Factors in IBS Project Management Key Success Factors in IBS Project Management, (APRIL). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.