Open Access
Issue
MATEC Web Conf.
Volume 86, 2016
5th International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education”
Article Number 05002
Number of page(s) 5
Section 5 Organization and Management in construction
DOI https://doi.org/10.1051/matecconf/20168605002
Published online 28 November 2016
  1. N. Ibadov, J. Kulejewski, M. Krzemiński, Fuzzy ordering of the factors affecting the implementation of construction projects in Poland, AIP Conf. Proc. 1558, (2002) [Google Scholar]
  2. P. Kowalik, M. Krzemiński, Logistyka NR 4, (2015) [Google Scholar]
  3. M. Krzemiński M, E. Krasnodębska, Theor. Found. Of Civ. Eng. Polish-Ukrainian Trans. 22, (2014) [Google Scholar]
  4. M. Krzemiński, AIP Conference Proceedings 1648, edited by T. Simos et al. (2015) [Google Scholar]
  5. M. Krzemiński, A. Wypysiak, Scheduling complete review application for road works, Procedia Engineering 91 (2014) [Google Scholar]
  6. A. Madureira, I. Pereira, N Sousa, P. Avila, J. Bastos, Comp. Intel. for Eng. Syst. 46, (2010) [Google Scholar]
  7. M. L. Pinedo, Scheduling: Theory, Algorithms, and Systems (Springer, 2012) [Google Scholar]
  8. M. L. Pinedo, Planning and Scheduling in Manufacturing and Services (Springer, 2009) [CrossRef] [Google Scholar]
  9. E. Zondervan, T. P. J. van Boekel, J. Fransoo, A. B. de Haan, Comp. Aid. Chem., Eng. (2014) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.