Open Access
Issue
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00105
Number of page(s) 6
DOI https://doi.org/10.1051/matecconf/20166600105
Published online 13 July 2016
  1. ILO: www.ilo.org/global/about-the-ilo/newsroom/features/WCMS_076282/lang--en/index.htmOECD (2008), [Google Scholar]
  2. OECD Environmental Outlook, OECD, Paris, France. [Google Scholar]
  3. KleindorferP., OktemU., PariyaniA. and SeiderW. (2012). Assessment of catastrophe risk and potential losses in industry. Computers & Chemical Engineering, 47, pp.85–96. [CrossRef] [Google Scholar]
  4. KonstandinidouM., NivolianitouZ., MarkatosN. And KiranoudisC. (2006). Statistical analysis of incidents reported in the Greek Petrochemical Industry for the period 1997—2003. Journal of Hazardous Materials, 135(1-3), pp.1–9. [CrossRef] [Google Scholar]
  5. KossorisM. (1939).A Statistical Approach to Accident Prevention.Journal of the American Statistical Association, 34(207), pp.524–532. [CrossRef] [Google Scholar]
  6. COOKEW. and GAUTSCHIF. (1981).OSHA, Plant Safety Programs, and Injury Reduction.Industrial Relations, 20(3), pp. 245–257. [Google Scholar]
  7. MajidM. and McCafferR. (1997).Assessment of Work Performance of Maintenance Contractors in Saudi Arabia. J. Manage. Eng., 13(5), pp. 91–91. [Google Scholar]
  8. VerbanoC., VenturiniK., (2013), “Managing Risks in SMEs: A Literature Review and Research Agenda”, Journal of Technology Management & Innovation 8(3), 1–17. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.