Open Access
Issue
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00101
Number of page(s) 5
DOI https://doi.org/10.1051/matecconf/20166600101
Published online 13 July 2016
  1. R. Kenley & O. Seppänen, Location-based Management for Construction. New York: Spon Press (2010)
  2. P. Weaver, A brief history of scheduling (2006) Online:http://www.mosaicprojects.com.au/PDF_Papers/P042_History%20of%20Scheduing.pdf
  3. P.B. Petersen, J. Mang. Issu. 3, 13173x2013;155 (1991) Online: http://www.jstor.org/stable/40603907
  4. E. Chrzanowski & D. Johnston, J. Constr. Eng. Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1986)112:4(476)
  5. F. Peña-Mora & M. Li, J. Constr. Eng. Manage. Online: http://ascelibrary.org/doi/10.1061/(ASCE)0733-9364(2001)127:1(1)
  6. F.K. Levy, G.L. Thompson & J.D. Wiest, Harv.Bus. Rev. 41, 98–108 (1963)
  7. J. Kelley, J. Indust. Sched. 21, 347–365 (1963)
  8. J. Kelley, & M. Walker, In Proceeding IRE-AIEE-ACM ‘59 (Eastern) ACM digital library: http://dx.doi.org/10.1145/1460299.1460318
  9. S. Perera, In Proceedings of IAHS Conference on Impact of Economy and Technology, 927–985 (1982).
  10. J. Meredith & S. Mantel, Project Management: A managerial approach. New York: John Wiley & Sons (1995)
  11. D. Arditi, & M. Albulak, J. Constr. Eng. Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1986)112:3(411)
  12. S. Suhail & R. Neale, J. of Constr. Eng. and Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:3(667)
  13. J. Lutz & A. Hijazi, Constr. Manage. Econ., 11, 99–110 (1993) [CrossRef]
  14. (ONM) Office of Naval Material, Line of Balance Technology (1962). Online: http://www.dtic.mil/dtic/tr/fulltext/u2/672029.pdf
  15. Z. Al Sarraj, J. of Constr. Eng.Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1990)116:4(689)
  16. R. Carr & W. Meyer, J. Constr. Div. ASCE, Online: http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001107
  17. R. Reda, J. Constr. Eng. Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1990)116:2(316)
  18. A. Russell & W. Wong, J. Constr. Eng. Manage. Online: http://dx.doi.org/10.1061/(ASCE)0733-9364(1993)119:2(196)
  19. L. Gorman, Rds. & Sts. 115, 74–75 (1972)
  20. S. Selinger, J. of the Constr. Div. ASCE Online: http://cedb.asce.org/cgi/WWWdisplay.cgi?9573
  21. S. Peer, J. of the Constr. Div. ASCE, 100, 203–210 (1974)
  22. G. Birell, J. Constr. Div. ASCE, 106, 389–407 (1980)
  23. R. Harris & P. Ioannou, J. Constr. Eng. Manage. Online: http://ascelibrary.org/doi/pdf/10.1061/(ASCE)0733-9364(1998)124:4(269)
  24. P. Lumsden, The Line of Balance Method. London, UK: Pergamon Press (1968)
  25. W. Alsakini, K. Wikstro & J. Kiiras, Int. J. Proj. Manag. 22, 75–85 (2004) [CrossRef]
  26. R. Kenley & T. Harfield, New Project Management Models: Productivity Improvement for Infrastructure. Perth: SBENRC (2014)
  27. O. Seppänen, Empirical research on the success of production control in building construction projects, Helsinki Finland: TKK Structural Engineering and Building Technology (2009)
  28. J. Kiiras, A schedule and resource planning system for the implemenation phase of special projects, Helsinki Finland: Helsinki University of Technology. Construction Economics and Management Publications (1989)
  29. R. Kenley & T. Harfield, In Proc. of the Int. Conf. Constr. Chang. Wld. Online: http://www.irbnet.de/daten/iconda/CIB_DC27620.pdf (2014)

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.