Issue |
MATEC Web Conf.
Volume 389, 2024
11th International Symposium on Occupational Health and Safety (SESAM 2023)
|
|
---|---|---|
Article Number | 00036 | |
Number of page(s) | 9 | |
DOI | https://doi.org/10.1051/matecconf/202438900036 | |
Published online | 10 January 2024 |
Explosion risk assessment - an important chapter of the explosion protection document
National Research and Development Institute for Mining Safety and Explosion Protection – INSEMEX, G-ral Vasile Milea Street, no. 32-34, Postal code: 332047, Petrosani, Hunedoara County, Romania
* Corresponding author: mirela.radu@insemex.ro
In order to improve the safety and health protection of workers who may be exposed to a potential risk due to explosive atmospheres, in every industrial area where such atmospheres may occur, the employer shall ensure the development and updating of a document called Explosion Protection Document. The main chapter of this document is the Explosion Risk Assessment.
Risk assessment is a complex process that involves identifying the risk, analyzing the risk and estimating the risk, the main purpose of assessing the level of risk being to establish the necessary protection measures to reduce it to acceptable levels.
This paper identifies the factors that may influence the level of risk of explosions in the workplace in order to establish the protection measures required to reduce the risk to acceptable levels.
Explosion risk assessment must be performed by competent persons with knowledge of technical, electrical and mechanical engineering and who understand the general principles of explosion protection.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.