Issue |
MATEC Web Conf.
Volume 389, 2024
11th International Symposium on Occupational Health and Safety (SESAM 2023)
|
|
---|---|---|
Article Number | 00037 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/matecconf/202438900037 | |
Published online | 10 January 2024 |
The specific risks encountered at workplaces in the mines of the Jiu Valley and their correlation with the levels of danger
National Institute for Research and Development in Mine Safety and Protection to Explosion – INSEMEX, 32-34 G-ral Vasile Milea street, 332047, Petrosani, Hunedoara country, Romania
In order to ensure an appropriate level of security and health in underground mining works, it is necessary to apply some methods of diagnosing the situation of the work system/workplace, from the aspect of work security, which involves:
- -
knowing the risk factors of occupational injury and illness;
- -
the ranking of risk factors in relation to the potential seriousness of the consequences on the executor;
- -
identification and ranking of preventive measures to be applied.
The assessment of the risk level is a systematic examination of all aspects of the work process, undertaken in order to eliminate the sources that could cause bodily harm, which constitute the basis for the substantiation of measures to prevent and combat risks. For this reason, all those involved in the work process must be consulted in the risk assessment process.
Specific risk monitoring aims to carry out a pre-accident type assessment of the risk of occupational injury and illness using assessment criteria that are based on quantitative risk assessment.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.