Issue |
MATEC Web Conf.
Volume 354, 2022
10th International Symposium on Occupational Health and Safety (SESAM 2021)
|
|
---|---|---|
Article Number | 00013 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/202235400013 | |
Published online | 06 January 2022 |
Perceived risk factors in the process of closure and greening of the Lupeni mining operation for the miner workplace
1 University of Petrosani, Department of Mechanical and Industrial Engineering and Transports, Universittii street, No.20, Petrosani, Romania
2 University of Petrosani, Departament of Management, Environmental Engineering and Geology, Universittii street, No.20, Petrosani, Romania
* Corresponding author: savio_scm@yahoo.com
Determining the risk factors of a job is a process that requires many studies. Determining risk factors is necessary to prevent accidents at work. The process of closing and greening the Lupeni Mining Exploitation is a very complex one. The closure of the mining operation is done in stages for the underground and the surface based on a closure project. When implementing the closure and greening project, all occupational safety and health regulations must be observed. As part of the process of closing and greening a mining operation, it is necessary to redo the risk factor assessment sheets with additional measures for the closure and greening of the mining operation. In this paper we intend to establish the risk factors for the miner workplace within the Lupeni Mining in the process of closure and greening.
© The authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.