Issue |
MATEC Web Conf.
Volume 346, 2021
International Conference on Modern Trends in Manufacturing Technologies and Equipment (ICMTMTE 2021)
|
|
---|---|---|
Article Number | 03109 | |
Number of page(s) | 7 | |
Section | Mechanical Engineering | |
DOI | https://doi.org/10.1051/matecconf/202134603109 | |
Published online | 26 October 2021 |
A Case Study on Implementation of 5S in a Manufacturing Plant to Improve Operational Effectiveness
Mechanical and Industrial Engineering Technology, University of Johannesburg, 2028 Johannesburg, South Africa
* Corresponding author: kgupta@uj.ac.za
5S is one of the important industrial engineering techniques to obtain workplace organization and efficiency enhancement. This paper reports a case study on implementation of 5S in a factory facility of a valve manufacturing company. The aim behind implementing 5S is to improve the productivity and efficiency by reducing the factory chaos, reducing the tool and material search time, and arranging the workplace for a better visibility of the machines, equipment, and items. Audit checklists, workplace pictures, and time study have been used to analyse the effect of 5S implementation. A strategic 5S implementation in this work resulted in much better workplace organization; improved visibility, appearance, and orderliness of objects; and significant reduction in the time to search or access tools.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.