Issue |
MATEC Web Conf.
Volume 346, 2021
International Conference on Modern Trends in Manufacturing Technologies and Equipment (ICMTMTE 2021)
|
|
---|---|---|
Article Number | 03018 | |
Number of page(s) | 7 | |
Section | Mechanical Engineering | |
DOI | https://doi.org/10.1051/matecconf/202134603018 | |
Published online | 26 October 2021 |
Risk Analysis is a Prerequisite for Quality Management of Traction Rolling Stock Repairs
1 Don State Technical University, Rostov-on-Don, Russia
2 South-Russian State Polytechnic University, Novocherkassk, Russia
3 Rostov State Transport University, Rostov-on-Don, Russia
4 KZ Rostselmash LLC, Rostov-on-Don, Russia
* Corresponding author: xvost72@mail.ru
The paper considers a new version of IRIS ISO/TS 22163:2017 standard in relation to the quality of repair of complex equipment in the railway industry. It is shown that the new version of ISO/ TS 22163:2017 standard provides for the need of organizations to conduct risk analysis and accounting in their work. The authors propose to consider as an example a well-established analysis of the types and consequences of potential defects in FMEA process. The use of FMEA analysis made it possible to consider the significance of various risks of the quality of traction rolling stock repair, as well as to establish the importance of quality control operations for impregnation of a traction motor.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.