Issue |
MATEC Web Conf.
Volume 275, 2019
1st International Conference on Advances in Civil Engineering and Materials (ACEM1) and 1st World Symposium on Sustainable Bio-composite Materials and Structures (SBMS1) (ACEM2018 and SBMS1)
|
|
---|---|---|
Article Number | 04002 | |
Number of page(s) | 7 | |
Section | Road and Bridge Engineering | |
DOI | https://doi.org/10.1051/matecconf/201927504002 | |
Published online | 13 March 2019 |
Skid resistance demands of asphalt pavement during the braking process of autonomous vehicles
School of Transportation, Southeast University, Nanjing 210096, China
* Corresponding author: zhengbs@seu.edu.cn
As the main operationality of AVs, the braking property is directly related to traffic safety. Major traffic accidents are often related to the braking distance, the side slip and hydroplaning during the emergency braking, which depends on the pavement skid resistance. Therefore, the estimation to relate AVs braking distance requirements with pavement peak friction coefficient to ensure a safe driving condition on expressway is of high practical significance. In this paper, the effect of AVs on braking performance parameters and dynamic friction on tire-pavement interaction are investigated. Based on the field test of the Coastal highway in Jiangsu province of China, this paper proposes an algorithm to determine time-dependent braking distance of AVs considering pavement frictional properties. According to the algorithm, an AVs braking system is provided to reach the maximum braking force for improving the AVs traffic safety. Furthermore, it revises the braking distance formula of Design Specification for Highway Alignment and the skid resistance threshold adopted by Technical Specifications for Maintenance of Highway Asphalt Pavement.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.