Rehabilitation of Marine Concrete Structure with Under-Water Hydrodemolition and Sprayed Concrete
1
Professor, Civil Engineering Department, Kangwon National University, S. Korea
2
Graduate Student, Civil Engineering Department, Kangwon National University, S. Korea
3
CEO, Daesang E&C, S. Korea
4
Senior Research Fellow, Korea Institute of Construction Technology, S. Korea
* Corresponding author: kkyun@kangwon.ac.kr
Hydrodemolition is a method of surface preparation using high-pressure water jets. Hydrodemolition cutting depth is dependent on the length of time that the water jet is directed at the concrete surface that determines the depth of removal, and contact time is controlled at the robotic cutter. During hydrodemolition concrete removal, the cement matrix is removed from the aggregate. This paper describe on the test results of under-water hydrodemolition which was done on a prefabricated concrete basin. A very simple and economic method for repairing the damaged concrete structures is a using a sprayed concrete, which is some times called as shotcrete. This paper, also, describe on the test results of sprayed concrete for the rehabilitation of marine concrete structure.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.