Issue |
MATEC Web Conf.
Volume 195, 2018
The 4th International Conference on Rehabilitation and Maintenance in Civil Engineering (ICRMCE 2018)
|
|
---|---|---|
Article Number | 06007 | |
Number of page(s) | 8 | |
Section | Construction Management and Maintenance | |
DOI | https://doi.org/10.1051/matecconf/201819506007 | |
Published online | 22 August 2018 |
The management strategy for government building disposal process in Jakarta
Civil Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus UI Depok 16424, Indonesia
* Corresponding author: ayomi@eng.ui.ac.id
The feasibility of government buildings, especially offices and schools as public service and social infrastructures, must be well maintained. When the building needs to be majorly rehabilitated, the government sometimes has to combine building demolition and deconstruction processes. In the government asset management cycle, the process starts with erasing the asset from the accountancy system, by selecting a building demolition contractor, then producing a new asset by selecting another builder contractor. In the past few years, the duration of this actual process acquired longer than the planned time. Therefore, this research aims to develop a management strategy in order to improve the government building disposal process. The process of the research started with obtaining the dominant factors that influence the demolition and deconstruction process, and then it is continued by developing the strategy.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.