Issue |
MATEC Web Conf.
Volume 195, 2018
The 4th International Conference on Rehabilitation and Maintenance in Civil Engineering (ICRMCE 2018)
|
|
---|---|---|
Article Number | 06006 | |
Number of page(s) | 9 | |
Section | Construction Management and Maintenance | |
DOI | https://doi.org/10.1051/matecconf/201819506006 | |
Published online | 22 August 2018 |
Improving business processes to develop standard operation procedures on government building maintenance work in Indonesia
Civil Engineering Department, Engineering Faculty, Universitas Indonesia, 16424 Kampus UI Depok, West Java, Indonesia
* Corresponding author: rossyarmyn@gmail.com
Preventive and corrective work carried out on government structures requires that Standard Operating Procedures for financial planning be developed to put an end to sharp practices which often result in budget wastage. The risk factors that can be instrumental to waste in the planning, implementation, maintenance, and supervision of government structures include Standard Operating Procedure that is not yet developed and organizational functions that are yet to be perfect. Hence, Standard Operating Procedure (SOP) requires good risk management. It will result in risk management strategy to enhance maintenance performance and maintenance of government building with respect to building health, building safety, comfort of the building and ease of constructing government building. The aim of this study is to find out how business processes and activities are organized for the planning, maintenance, implementation as well as supervision of government structures. The methodology used included expert validation, respondent survey and benchmarking analysis to determine its business process. The results of this study indicate that there are 164 activities in 16 business processes for preventive and corrective work relating to execution, planning, and supervision of government structures.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.