Issue |
MATEC Web Conf.
Volume 181, 2018
The 1st International Symposium on Transportation Studies for Developing Countries (ISTSDC 2017)
|
|
---|---|---|
Article Number | 09001 | |
Number of page(s) | 9 | |
Section | Freights and Logistics | |
DOI | https://doi.org/10.1051/matecconf/201818109001 | |
Published online | 30 July 2018 |
Potential cargo demand of Kuala Tanjung Port as international hub port in Western Indonesia
1
Ministry of Transport, Center of Research and Development, Jakarta, Indonesia
2
Andi Jemma University, Department of Civil Engineering, Palopo, Indonesia
* Corresponding author : rosita_dephub@yahoo.com
The Port of Kuala Tanjung will provide a logistical diversification opportunity in which the need for freight services for both export, import, and inter-island distribution through port will continue to increase. Seeing the magnitude of this potential, it is hoped that Kuala Tanjung Port can become an alternative International Hub Port in Western Indonesia that can provide added value for economic growth significantly. As a potential port to become an international Hub Port, Kuala Tanjung must have a large cargo demand, coming from its own hinterland as well as shifting from other nearby ports. The largest potential hinterland of Kuala Tanjung Port is in the form of oil palm and rubber plantations with derivative goods. Kuala Tanjung Port is predicted to accommodate 65% of total goods production in North Sumatra, both containerized and bulk liquid.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.