Issue |
MATEC Web Conf.
Volume 137, 2017
Modern Technologies in Manufacturing (MTeM 2017 - AMaTUC)
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 12 | |
Section | Manufacturing Engineering | |
DOI | https://doi.org/10.1051/matecconf/201713701014 | |
Published online | 22 November 2017 |
Selection of methods used for analyzing the standard time needed to complete the assembly process by means of a fuzzy analytic hierarchy process
1 State University of Applied Sciences in Konin, Faculty of Engineering
2 Poznan University of Technology, Faculty of Mechanical Engineering and Management
* Corresponding author: robertcieslak@wp.pl
This paper is a review of four main methods of analyzing the standard time needed to complete a given job: chronometric analysis, working-day activity study (working-day photo), work sampling observations, and analysis of basic motions. Thanks to the application of FAHP (Fuzzy Analytic Hierarchy Process) method, the values of weighted coefficients were obtained which describe the importance of selecting the criteria of the choice of methods used to analyze the standard time in the assembly process. In the summary paragraph of this paper, the results of analyzing the criteria are discussed.
© The authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.