Issue |
MATEC Web Conf.
Volume 117, 2017
RSP 2017 – XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineering
|
|
---|---|---|
Article Number | 00076 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/201711700076 | |
Published online | 24 July 2017 |
On Preparing Offers for Targeted Development Programs in Housing and Communal Services
Moscow state university of civil engineering, Yaroslavskoye shosse, 26, Moscow, Russia, 129337
* Corresponding author: KhairullinRZ@mgsu.ru
The article offers a mathematic development model for economically sound and close to optimum park of technical facilities used in housing and communal services, that implies purchasing new samples of these facilities and upgrade items already existing that have quite low level of technical perfection. A level of technical perfection of the item is a complex (integral) characteristic that relies on the system of indexes that describe its main properties, based on its purpose, and is reflective of its technical progressiveness. Level of technical perfection of the park is a mean weighted sum of technical perfection parameters for all the items in the park. The model is based on algorithm for presentation of technical facilities development park and is made as a standard task of linear programming, solution methods with limitations in the form of equalities and inequalities, including methods of integer linear programming. The criterion used is an indicator that characterize reduction of degradation, a value inverse to the technical perfection level. The author analysed economic expediency of combined purchases and upgrades for various types of technical facilities under various amounts of financing. The article presents results of mathematic model approbation.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.