Issue |
MATEC Web Conf.
Volume 86, 2016
5th International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education”
|
|
---|---|---|
Article Number | 05018 | |
Number of page(s) | 7 | |
Section | 5 Organization and Management in construction | |
DOI | https://doi.org/10.1051/matecconf/20168605018 | |
Published online | 28 November 2016 |
The Management of Park Equipment and Machinery Used in the Construction Industry and Housing Sector
1 Doctor of Physics and Mathematics, Professor, Moscow State University of Civil Engineering, Moscow, Russia
2 Ph.D, Head of Department, Main Scientific Metrological Center, Mytishchi, Moscow region, Russia
The mathematical model was created, applicable to elaboration of options of development of a park of equipment and machinery used in construction industry, housing and utility management. The model based on solving the linear programming problem by means of simplex method. The mathematical model allows develop the rational plans and quasi optimal plans. The model is based on the created in the article the financial management algorithms of procurement and of repairs of equipment and machinery. The algorithms allow to take into account joint consideration of indicators of modernity and operability of equipment and machinery. The basic model is developed. The model is included into the automated planning system. It is used for planning and preparation of proposals of draft policy documents for development of park devices, equipment and machinery.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.