Issue |
MATEC Web Conf.
Volume 116, 2017
6th International Scientific Conference “Reliability and Durability of Railway Transport Engineering Structures and Buildings” (Transbud-2017)
|
|
---|---|---|
Article Number | 01020 | |
Number of page(s) | 4 | |
Section | Construction Materials, Protection and Repair of Structures and Buildings | |
DOI | https://doi.org/10.1051/matecconf/201711601020 | |
Published online | 10 July 2017 |
Ecological indices of manufacture of Portland cement clinker and production of the dolomite clinker
1 Kharkiv National University of Civil Engineering and Architecture, Department of Mechanization of Construction Processes, Sumska st. 40, 61002 Kharkiv, Ukraine
2 Ufa State Petroleum Technological University, Department of Building Constructions, Pervomayskaya st. 14, 450062 Ufa, Russia
* Corresponding author: vvinnichenko@ukr.net
It is shown that the production of dolomite clinker in comparison with that of Portland cement is environmentally appropriate. When calcining dolomite for cementitious binder, the pollution of the atmosphere by carbon dioxide is reduced due to its isolation during decarbonization reactions of calcium carbonates. Reducing fuel consumption for clinker burning provides less carbon dioxide emissions from combustion products. Reducing the firing temperature creates obstacles to the formation of nitrogen oxides. The production of binders from dolomite in comparison with the production of Portland cement helps to protect the environment from contamination
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.