Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 03013 | |
Number of page(s) | 8 | |
Section | Part 3: Manufacturing innovation and Advanced manufacturing technology | |
DOI | https://doi.org/10.1051/matecconf/201710003013 | |
Published online | 08 March 2017 |
Study on the Application of 6σ Method in Shoemaking Enterprise Quality Improvement
1 School of Management, Guizhou University, Guizhou, China
2 Jinan Railway Bureau, Jinan, China
* Corresponding Email: 953749935@qq.com
With the development of science as well as technology and the influx of shoemaking companies abroad, our traditional shoemaking enterprises face greater pressure to survive, and product quality problems are in urgent need of improvement. Aiming at the quality problems of M shoemaking enterprise, DMAIC method is used to conduct the product quality improvement, and a mathematical statistics software Minitab is used to analyze the data. Moreover, the optimum combination of the key influencing factors is determined by orthogonal experiment design as well as a set of specific quality improvement plans are put forward. Finally, the production process capability of M enterprise is improved, the product bonding strength is enhanced, customer satisfaction is improved, and the thoughts of product quality improvement and reference are provided for domestic traditional shoemaking enterprises.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.