Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 02046 | |
Number of page(s) | 8 | |
Section | Part 2: Internet +, Big data and Flexible manufacturing | |
DOI | https://doi.org/10.1051/matecconf/201710002046 | |
Published online | 08 March 2017 |
A Research on Development of Construction Industrialization Based on BIM Technology under the Background of Industry 4.0
School of Management Engineering, Zhengzhou University, Zhengzhou, Henan, China
* Corresponding author: junjie87@126.com
“Industry 4.0” and “Made in China 2025”, the future strategic plans of the manufacturing industry in Germany and China, are being noted and studied all over the world. In this wave, information and industrialization of production are Construction industry development direction in the future. Based on the introduction of the strategic objectives of “Made in china 2025”, a new production pattern of construction industrialization, which is based on BIM technology, are put forward in this paper. Comparative analysis is used in the study of mechanism and development path of the production pattern. The dilemma of construction industrialization confronted at present is illustrated in this paper. Based on the background of implementation of “Made in China 2025”, the countermeasures and suggestions of the new production pattern have been proposed.
Key words: Industry 4.0 / made in china 2025 / construction industrialization / building information modelling / path research
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.