Research of self-power Generation Scheduling Model Base on Multi-objective in Iron and Steel Enterprises
Research and Development Center of NR Electric Co., Ltd., Nanjing 211102, China
* Corresponding Email: genx@nrec.com
With the targets of the minimum cost of power generation and the lowest rate of gas emission in iron and steel enterprises, a multi-objective self-power generation optimal scheduling model was built based on multi-objective particle swarm optimization the research of coupling relationship of gas and power. And by using the hierarchical decomposition method, the model was broken down into two parts: optimization of gas system and optimization of thermal and power system. The case analysis indicated that: the model could distribute the energy of gas and power reasonably, safely and efficiently when the production condition was changed, and improve the energy utilization efficiency.
Key words: Iron and steel enterprises / multi-objective particle swarm optimization / cooperated optimization / self-power generation optimal scheduling
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.