Issue |
MATEC Web Conf.
Volume 95, 2017
2016 the 3rd International Conference on Mechatronics and Mechanical Engineering (ICMME 2016)
|
|
---|---|---|
Article Number | 18003 | |
Number of page(s) | 5 | |
Section | Environment and Energy | |
DOI | https://doi.org/10.1051/matecconf/20179518003 | |
Published online | 09 February 2017 |
Stochastic Lot-Sizing under Carbon Emission Control for Profit Optimisation in MTO Manufacturing
Department of Industrial and Manufacturing Systems Engineering, the University of Hong Kong, Hong Kong
Aggravating global warming has heightened the imminent need by the world to step up forceful efforts on curbing emission of greenhouse gases. Although manufacturing is a major resource of carbon emission, few research works have studied the impacts of carbon constraints on manufacturing, leading to environmentally unsustainable production strategies and operations. This paper incorporates carbon emission management into production planning for make-to-order (MTO) manufacturing. This paper proposes a model that solves lot-sizing problems to maximise profits under carbon emission caps. The model adopts stochastic interarrival times for customer orders to enhance the practicality of the results for real-world manufacturing. Numerical experiments show that reducing carbon emission undercuts short-term profits of a company. However, it is conducive to the company’s market image as being socially responsible which would attract more customers who concern about environmental protection. Hence, reducing carbon emission in manufacturing is beneficial to long-term profitability and sustainability. The results provide managerial insights into manufacture operations for balancing profitability and carbon control.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.