Issue |
MATEC Web of Conferences
Volume 55, 2016
2016 Asia Conference on Power and Electrical Engineering (ACPEE 2016)
|
|
---|---|---|
Article Number | 06010 | |
Number of page(s) | 7 | |
Section | Dynamic Load Modelling and Renewable Energy System | |
DOI | https://doi.org/10.1051/matecconf/20165506010 | |
Published online | 25 April 2016 |
Emergency Linkage Mode of Power Enterprise
State Grid Smart Grid Research Institute, Information & communication research department, Beijing, China
a Corresponding author : fengjie_leo@163.com
Power emergency disposal needs take full advantage of the power enterprise within the external emergency power and resources. Based on analyzing and summarizing the relevant experience of domestic and foreign emergency linkage, this paper draws the Emergency Linkage subjects, Emergency Linkage contents, Emergency Linkage level, which are three key elements if power enterprise Emergency Linkage. Emergency Linkage subjects are divided into the two types of inner subjects and the external body; Emergency Linkage contents are in accordance with four phases of prevention, preparedness, response and recovery; Emergency Linkage level is divided into three levels of enterprise headquarter, provincial enterprise and incident unite. Binding power enterprise emergency management practice, this paper studies the internal Emergency Linkage modes (including horizontal mode and vertical mode), external Emergency Linkage mode and comprehensive Emergency Linkage Mode of power enterprise based on Fishbone Diagram and Process Management Technology.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.