Issue |
MATEC Web of Conferences
Volume 44, 2016
2016 International Conference on Electronic, Information and Computer Engineering
|
|
---|---|---|
Article Number | 02026 | |
Number of page(s) | 4 | |
Section | Electronics, Information and Engineering Application | |
DOI | https://doi.org/10.1051/matecconf/20164402026 | |
Published online | 08 March 2016 |
Study on disruption management scheduling problem of flow shop under supply chain environment
1
Institute of Production Operation and Logistics Management, Dalian University of Technology, Dalian 116023, China
2
CSR Qingdao Sifang Co., Ltd., Qingdao 266111, China
3
Crrc Central Research Institute, Qingdao 266111, China
Li Longlong: Lee_dlut@163.com
This paper presents a disruption scheduling model for an environment of proportional two-machine no-wait flow shop. To achieve the objects of minimization of weighted sum of makespan and minimization of weighted sum of tardiness, we introduce a revised PSO algorithm which is designed with a neighborhood search structure. According to the experiment, the effectivity of the method proposed is proven.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.