Open Access
Issue
MATEC Web of Conferences
Volume 44, 2016
2016 International Conference on Electronic, Information and Computer Engineering
Article Number 02026
Number of page(s) 4
Section Electronics, Information and Engineering Application
DOI https://doi.org/10.1051/matecconf/20164402026
Published online 08 March 2016
  1. Pinedo M. Scheduling theory, algorithm and systems. [M]. Fourth edition, New York : Springer Science + Business Media, LLC, 2012. [Google Scholar]
  2. Stefan Voß, Andreas Witt. Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application[J]. International Journal of Production Economics. 2005 (2) [Google Scholar]
  3. Lee C Y, Joseph Y T, Leung, Yu G. Two Machine Scheduling under Disruptions with Transportation Considerations[J] Journal of Scheduling, 2006, 9(1) :35–48. [CrossRef] [Google Scholar]
  4. Liou Tian Shy, Wang Mao Jun. Ranking fuzzy numbers with integral value[J]. Computer and Mathematics with Application, 2005, 49: 1731–1753. [CrossRef] [Google Scholar]
  5. BO Hong-guang; PAN Yu-tao; MA Xiao-yan. Disruption Management for Production Rescheduling in Two-machine No-wait Flow Shop [J] . Operation Research and Management Science. 2013, 04: 111–119+125. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.