Issue |
MATEC Web Conf.
Volume 290, 2019
9th International Conference on Manufacturing Science and Education – MSE 2019 “Trends in New Industrial Revolution”
|
|
---|---|---|
Article Number | 08014 | |
Number of page(s) | 10 | |
Section | Mechanical Engineering, Mechatronics and Robotics | |
DOI | https://doi.org/10.1051/matecconf/201929008014 | |
Published online | 21 August 2019 |
The welding program optimization of a S355 steel assembly used in agricultural machinery
University “Aurel Vlaicu” of Arad, AIITT Department, B-dul Revoluției, nr.77, 310130, Romania
* Corresponding author: muncutstela@yahoo.com
The paper will include the realization of a weld joint line with an ABB robot. The manufacturing area contains a welding device and a robot. For the robotic welding, the methods and a complete welding program will be presented. The first stage is the design of the device that can be used for manufacturing a range of comparable size pieces with similar gripping capability. There are described the axes and the way of movement, the presentation of the speeds for the rotating joints and roto-translation. CAD design of the workpiece including WPS (welding technology that contains the shape of each joint and welding parameters: welding current, electric arc voltage, welding speed and secondary parameters). The base material, the addition material, protective gases and a list of parts from the robot that require periodic changes will be presented. It is presented the CAD design of the workpiece including WPS.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.