The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Impact assessment of critical success factors (CSFs) in public construction projects of Saudi Arabia

Yazeed A. Alragabah and Mohd. Ahmed
Frontiers in Engineering and Built Environment 4 (3) 184 (2024)
https://doi.org/10.1108/FEBE-10-2023-0048

Causes of miscommunication leading to project delays and low work quality in the construction industry of Saudi Arabia

Asmaa Alaaeldin Abdallah, Mohammed Essam Shaawat and Abdulaziz S. Almohassen
Ain Shams Engineering Journal 15 (3) 102447 (2024)
https://doi.org/10.1016/j.asej.2023.102447

Building Information Modeling Impact on Cost Overrun Risk Factors and Interrelationships

Aljawharah A. Alnaser, Khalid S. Al-Gahtani and Naif M. Alsanabani
Applied Sciences 14 (22) 10711 (2024)
https://doi.org/10.3390/app142210711

Identifying the Most Effective Delaying Factors Using FCEM-AHP: A Case Study of Pakistan’s Construction Industry

Safi Ullah, Muhammad Siddiq, Deng Xiaopeng, Sun Jun, Diana R. Anbar, Chiemela Victor Amaechi and Muhammad Waqas Ashraf
Journal of the Knowledge Economy (2024)
https://doi.org/10.1007/s13132-024-02464-0

A Comprehensive Review of the Factors and Strategies to Mitigate Construction Projects Delays in Saudi Arabia

Adel Alshammari and Farid E. Mohamed Ghazali
The Open Construction & Building Technology Journal 18 (1) (2024)
https://doi.org/10.2174/0118748368318470240806113627

Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia

Saad Alshihri, Khalid Al-Gahtani and Abdulmohsen Almohsen
Buildings 12 (7) 902 (2022)
https://doi.org/10.3390/buildings12070902

Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)

Basem Al Khatib, Yap Soon Poh and Ahmed El-Shafie
Sustainability 12 (15) 6171 (2020)
https://doi.org/10.3390/su12156171

Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project

Basem Al Khatib, Yap Soon Poh and Ahmed El-Shafie
Sustainability 10 (12) 4772 (2018)
https://doi.org/10.3390/su10124772

An initial investigation on the challenges of managing construction workforce in Saudi Arabia

N Al-Emad and I A Rahman
IOP Conference Series: Materials Science and Engineering 271 012033 (2017)
https://doi.org/10.1088/1757-899X/271/1/012033