Volume 411, 2025
Joint 14th International Conference on Engineering, Project, and Production Management (EPPM2024) and 5th Zaytoonah Engineering Conference (ZEC2024)
Article Number 03001
Number of page(s) 14
Section Project Management, Organizational, and Safety Studies
DOI https://doi.org/10.1051/matecconf/202541103001
Published online 05 September 2025
  1. Aguda, R., Bonilla, S., Hmida, J. Ben, & Revellame, E. D. (2021). Challenges and Oppor-tunities in Developing Project Management Decision-Making Tools. Journal of Engineering, Project, and Production Management, 11(2), 127-138. https://doi.org/10.2478/jeppm-2021-0013 [Google Scholar]
  2. A. H. Nassar, "Causes and Effects of Delay in the Construction Industry in Egypt," Inter-national Journal of Engineering. Research & Technology, p. 6, 2016. [Google Scholar]
  3. Brady, D. A., Tzortzopoulos, P., Rooke, J., Formoso, C. T., & Tezel, A. (2018). Improving transparency in construction management: a visual planning and control model. Engineer-ing, Construction and Architectural Management, 25(10), 1277-1297. https://doi.org/10.1108/ECAM-07-2017-0122 [Google Scholar]
  4. Brockmann, C., & Kähkönen, K. (2012). Evaluating Construction Project Complexity. Cib Joint International Smposium, 716-727. http://www.irbnet.de/daten/iconda/CIB DC25682.pdf [Google Scholar]
  5. Coble, L. K. (2018). Real Construction Mitigation Case Studies. Collaborative Risk Miti-gation Through Construction Planning and Scheduling, June 2006, 23-63. https://doi.org/10.1108/978-1-78743-147-820181005 [Google Scholar]
  6. Dao, B., Kermanshachi, S., Shane, J., Anderson, S., & Hare, E. (2017). Exploring and As-sessing Project Complexity. Journal of Construction Engineering and Management, 143(5). https://doi.org/10.1061/(asce)co.1943-7862.0001275 [Google Scholar]
  7. Hossny, H. E., Ibrahim, A. H., & Elnady, A. (2021). Assessment of Construction Project Complexity. The Open Civil Engineering Journal, 15(1), 414-423. https://doi.org/10.2174/1874149502115010414 [Google Scholar]
  8. Markit, I. H. S. (2020). Global Construction Outlook:Executive Overview. July. [Google Scholar]
  9. Marzoughi, F., Arthanari, T., & Askarany, D. (2018). A Decision Support Framework for Estimating Project Duration under the Impact of Weather A novel model to estimate the duration of construction projects is proposed. The model incorporates weather related factors to increase its accuracy. It is capable. January. [Google Scholar]
  10. Moazzami, M., Dehghan, R., & Ruwanpura, J. Y. (2011). Contractual risks in fast-track projects. Procedia Engineering, 14, 2552-2557. https://doi.org/10.1016/j.proeng.2011.07.321 [Google Scholar]
  11. M. Sieffen, H. Salama and A. Nassar, "Technological and Environmental Decisions for Smart Cities," 2023 2nd International Conference on Smart Cities 4.0, Cairo, Egypt, 2023, pp. 422-426, doi: https://doi.org/10.1109/SmartCities4.056956.2023.10526030. keywords: {Smart cities;Bibliographies;Decision making;Environmental fac-tors;Complexity theory;Smart Cities;Decision;Technology;Environment}, URL: https://ieeexplore.ieee.org/stamp/stamp.jsp?tp= & arnumber=10526030 & isnumber=10525232 [Google Scholar]
  12. Nandonde, F. A. (2021). Application of PESTLE Analysis In Construction Industry. PESTEL Analysis, 38(4), 54-61. https://www.academia.edu/45297807/Application of PESTLE Analysis In Construction Industry [Google Scholar]
  13. Nawaz, F. (2010). Programmatic approaches to address corruption in the construction sector. 254(August). [Google Scholar]
  14. Nguyen, T. P., & Chileshe, N. (2013). Revisiting the critical factors causing failure of con-struction projects in Vietnam. Proceedings 29th Annual Association of Researchers in Construction Management Conference, ARCOM 2013, June 2014, 929-938. [Google Scholar]
  15. Nurshapika Adila. (2018). Causes and Effects of Delay in the Construction Project Nurshapika Adila Binti Adnan. March. [Google Scholar]
  16. O'Brochta, M., Meloni, G., Raghupathy, S., Pfeiffer, P., & Taylor, M. (2011). PMI Ethical Decision- Making Framework ( EDMF ). 1-2. [Google Scholar]
  17. Ochieng, D. E., Price, A., & Moore, D. (2018). Management of Global Construction Projects. SSRN Electronic Journal, July. https://doi.org/10.2139/ssrn.3105473 [Google Scholar]
  18. Othman, I., Kineber, A. F., Oke, A. E., Zayed, T., & Buniya, M. K. (2021). Barriers of value management implementation for building projects in Egyptian construction industry. Ain Shams Engineering Journal, 12(1), 21-30. https://doi.org/10.1016/j.asej.2020.08.004 [Google Scholar]
  19. Poon, S. W., & Price, A. D. F. (1999). Decisions made on construction sites. Association of Researchers in Construction Management, 2(September), 589-594. [Google Scholar]
  20. Project Management Institute. (2015). Topic 4 : Enterprise Environmental Factors ( EEFs ). 27-50. [Google Scholar]
  21. R. Ahmed and A. Nassar, "The effect of risk allocation on minimizing disputes in con-struction projects in Egypt", International Journal of Engineering Research & Technology, vol. 5, no. 3, pp. 523-528, 2016. [Google Scholar]
  22. Seresht, N. G., Lourenzutti, R., Salah, A., & Fayek, A. R. (2018). Overview of Fuzzy Hy-brid Techniques in Construction Engineering and Management. In Fuzzy Hybrid Compu-ting in Construction Engineering and Management: Theory and Applications (Issue 3). https://doi.org/10.1108/978-1-78743-868-220181002 [Google Scholar]
  23. Zou, P. X. W. (2006). Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), 15-29. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.