Open Access
Issue
MATEC Web Conf.
Volume 364, 2022
International Conference on Concrete Repair, Rehabilitation and Retrofitting (ICCRRR 2022)
Article Number 04022
Number of page(s) 8
Section Concrete Repair, Rehabilitation and Retrofitting - Service Life Extension: Methods and Materials
DOI https://doi.org/10.1051/matecconf/202236404022
Published online 30 September 2022
  1. P. C. Bamu, A. Zingoni, Damage, deterioration and the long-term structural performance of cooling tower shells: A survey of developments over the past 50 years. Engineering Structures 27, 1794 (2005). [CrossRef] [Google Scholar]
  2. P. B. Bosman, Review and feedback of experience gained over the last 50 years in design and construction of natural-draught cooling towers. Engineering Structures 7, 268 (1985). [CrossRef] [Google Scholar]
  3. P. L. Gould, W. B. Kratzig, Cooling Tower Structures. Handbook of Structural Engineering, CRC Press LLC, 14-1 to 14-32 (1997). [Google Scholar]
  4. J.J. Basson, B.J. Addis, Holistic Approach to the Corrosion of Concrete in Aqueous Environments Using Indices of Aggressiveness. ACI Special Publication 131, 33-66 (1992). [Google Scholar]
  5. The South African Bureau of Standards. SABS 01001 Ed. 2.2 The structural use of concrete, Part 1: Design. South African Bureau of Standards (2000). [Google Scholar]
  6. The South African Bureau of Standards. SANS 10160-3:2018 Ed. 2 Basis of structural design and actions for buildings and industrial structures, Part 3: Wind actions. South African Bureau of Standards (2018). [Google Scholar]
  7. VGB PowerTech e.V., Structural Design of Cooling Towers VGB-R 610 e. VGB PowerTech e.V. (2010) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.