Open Access
Issue |
MATEC Web Conf.
Volume 310, 2020
4th International Scientific Conference Structural and Physical Aspects of Construction Engineering (SPACE 2019)
|
|
---|---|---|
Article Number | 00037 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/matecconf/202031000037 | |
Published online | 05 March 2020 |
- Chowdhury, F.H.,Raihan, M.T. andIslam, G.M.S. IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III. (Dhaka, Bangladesh, 2015). [Google Scholar]
- Farrar, C. R.,Lynch, J. P.,Michaels, J. E. Proceedings of the IEEE. (2016) Vol. 104 (8). [Google Scholar]
- Kuras, P. et al. Bridge Maintenance, Safety, Management, Resilience and Sustainability. (Taylor & Francis Group, London, UK, 2012). [Google Scholar]
- Gentile, C.: Radar Technology. (InTech, Rijeka, Croatia, 2010). [Google Scholar]
- Gocal, J. et al. Determination of displacements and vibrations of engineering structures using ground-based radar interferometry. (Wydawnictwa AGH, Krakow, 2013). [Google Scholar]
- Raventós, J.,Couso, C.,García, J. INGEO 2017 Proceedings of the 7th International Conference on Engineering Surveying. (Lisabon, Portugal, 2017). [Google Scholar]
- Li, H.-N. et al. Structural Monitoring and Maintenance. (Techno-Press, 2016). [Google Scholar]
- Sokol, M.,Venglár, M.,Ároch, R.,Kopáčik, A.;Kyrinovič, P.;Erdélyi, J.,Šišmišová, Z.,Lamperová, K. 39th IABSE Symposium – Engineering the Future. (Vancouver, Canada, 2017). [Google Scholar]
- Ingegneria Dei Sistemi (IDS) S.p.A.: IBIS-S System ver. 1.0 – User Manual. (Pisa, 2010). [Google Scholar]
- STN 73 6209: Load testing of bridges, SÚTN Bratislava, 09, (1987) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.