Open Access
Issue
MATEC Web Conf.
Volume 280, 2019
The 5th International Conference on Sustainable Built Environment (ICSBE 2018)
Article Number 05010
Number of page(s) 10
Section Sustainable Resource Management
DOI https://doi.org/10.1051/matecconf/201928005010
Published online 08 May 2019
  1. M. Nichola John and Herman Steyn, Project Management for Business, Engineering, and Technology, UK: Elsevier Inc. (1990) [Google Scholar]
  2. Praboyo, Budiman, Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-penyebabnya. Dimensi Teknik Sipil, Vol 1 no. 2, September, Universitas Kristen Petra (1999) [Google Scholar]
  3. C. Yuliana, Analisis Faktor Penyebab Terjadinya Keterlambatan Pada Pelaksanaan Proyek Pembangunan Jembatan. Dimensi Teknik Sipil, Vol. 14 no. 2, December, Universitas Lambung Mangkurat (2013) [Google Scholar]
  4. N. Puspitasari, Analisa Faktor Keterlambatan Proyek Konstruksi. S1 Teknik Sipil. Universitas Lambung Mangkurat. Banjarbaru (2010) [Google Scholar]
  5. I. Soeharto, Manajemen Proyek dari Konseptual Sampai Operasional, Erlangga Jakarta (1997) [Google Scholar]
  6. A Guide to The Project Management Body of Knowledge (PMBOK® Guide) 4th edition, Project Management Institute (2004) [Google Scholar]
  7. A Guide to The Project Management Body of Knowledge (PMBOK® Guide) - Fifth Edition, Project Management Institute (2013) [Google Scholar]
  8. A. Ashworth, Cost Studies of Buildings 4th edition. Pearson, Prentice hall-British (2004) [Google Scholar]
  9. J. Duncan M., An Evaluation of Construction Quality, Internasional Journal of Quality and Reliability Management, Vol. 19, No.6 (1990) [Google Scholar]
  10. Asiyanto, Construction Project Cost Management, PT Pranya Paramita. Jakarta (2003) [Google Scholar]
  11. G. Taylor R., The Importance of Estimating Your Overhead, Cost Engineering (1994) [Google Scholar]
  12. R. Clough H., Sear, G. A. and Sears S. K., Construction Project Management 4th edition, Jhon Wiley & Sons, Inc. USA (2000) [Google Scholar]
  13. Sunny and Kim Baker, One Time/On Budget: A Step by Step Guide for Management Any Project, Prentice Hall, Englewood Cliffs (1992) [Google Scholar]
  14. R. Amperawan K., Journal of Construction Engineering & Management, Vol. 1, January/February (1999) [Google Scholar]
  15. S. Ahmed, Construction Delays: An Empirical Study (1998) [Google Scholar]
  16. A. Odeh M., Cause of Construction Delay: Traditional Contract. International Journal of Project Management, 20 (2001) [Google Scholar]
  17. Y. Frimpong, Cause of Delay and Cost Overruns in Construction of Groundwater Project in Developing Countries: Ghana as Study Case. International Journal of Project Management, 21 (2002) [Google Scholar]
  18. S. Assaf A., Cause of Delay in Large Construction Project, International Journal of Project Management, 24 (2005) [Google Scholar]
  19. El-Rzek, M.E. Abd., Cause of Delay in Building Construction Projects in Egypt, Journal of Construction Engineering and Management, Vol. 134, No. 11, November (2008) [Google Scholar]
  20. M. Sambasivan and Soon, Y.W., Cause and Effects of Delay in Malaysian Construction Industry, International Journal of Project Management, vol. 25 (2007) [Google Scholar]
  21. S. Tumi Al Hadi, Cause of Delay in Construction Industry in Libya (2009) [Google Scholar]
  22. L. Le-Hoai, Delays and Cost Overruns in Vietnam Large Construction Project: A Comparisons With Other Selected Countries, KSCE Journal of Civil Engineering (2008) [Google Scholar]
  23. N. Archarya K., Investigating Delay Factors in Construction Industry: A Korean Perspective, Korean Journal of Construction Engineering and Management, 10 (2006) [Google Scholar]
  24. A. Faridi S., and El Sayegh S.M., Significant Factors Causing Delay in The UAE Construction Industry, Journal of Construction Management and Economics, Vol. 24, No. 11 (2006) [Google Scholar]
  25. P. Koushiki A, Delays and Cost Increases in The Construction of Private Residential Projects in Kuwait. Journal of Construction Management and Economic, Vol. 23, No. 3 (2005) [Google Scholar]
  26. A. Aibinu A. and A. Odeyinka, Construction Delays and Their Causative Factor In Nigeria, Journal of Construction Engineering and Management, Vol. 10 (2006) [Google Scholar]
  27. I. Soeharto, Manajemen Proyek dari Konseptual Sampai Operasional, Erlangga Jakarta (1999) [Google Scholar]
  28. Saaty, Thomas L., Decision Making for Leaders The Analytical Hierarchy Process for Decisions in Complex World University of Pittsburgh 322 Mervis Hali Pittsburgh, PA 15260 (1970) [Google Scholar]
  29. Marimin, Teknik dan Aplikasi Pengambilan Keputusan Kriteria Majemuk, Jakarta (2005) [Google Scholar]
  30. H. Kerzner, International Journal Project management, 25 (2006) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.