Open Access
Issue |
MATEC Web Conf.
Volume 280, 2019
The 5th International Conference on Sustainable Built Environment (ICSBE 2018)
|
|
---|---|---|
Article Number | 05009 | |
Number of page(s) | 9 | |
Section | Sustainable Resource Management | |
DOI | https://doi.org/10.1051/matecconf/201928005009 | |
Published online | 08 May 2019 |
- Aibinu A. and Jagboro G. O., The Effects of Construction Delay on Project Delivery in Nigerian Construction Industry, International Journal of Project Management, 25, pp. 593–599 (2002). [CrossRef] [Google Scholar]
- Alinaitwe H., Apolot R. and Tindiwensi D., Investigation into the causes of Delays and Cost Overruns in Uganda’s Public Sector Construction Projects, Journal of Construction in Developing Countries, 18(2), pp. 33–47 (2013). [Google Scholar]
- Ayudhya B. I. N., Evaluation of Common Delay Causes of Construction Projects in Singapore. Journal Of Civil Engineering and Architecture (2011) [Google Scholar]
- Gandhak P. S. and Sabihuddin S., Stakeholders’ perception of the causes and effect of construction delays on project delivery, International Journal of Modern Engineering Research (IJMER), 14(2), 153–161 (2014). [Google Scholar]
- M.J. Kamanga dan W.J.v.d.M Steyn., Causes of delay in road construction projects in Malawi. Journal of the south African Institution of Civil Engineering, Vol. 55 (3), pp. 79–85. (2013) [Google Scholar]
- Mahamid I. Common risks affecting time overrun in road construction projects in Palestine: Contractor’s perspective, Australasian Journal of Construction Economics and Building, 13 (2), pp.45–53. (2013) [CrossRef] [Google Scholar]
- Patil, S.K., Gupta A.K., Desai D.B dan Sajane., Causes of Delay in Indian Transportation Infrastructure Projects. International Journal of Research in Engineering and Technology. (2013). [Google Scholar]
- Priyono, Hery., Analisa Keterlambatan Proyek Konstruksi di Kabupaten Rembang. Tesis. Universitas Diponegoro Semarang. (2016) [Google Scholar]
- Sambasivan, M. dan Y. W. Soon. Cwasan causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management. Elsevier. (2006) [Google Scholar]
- Suyatno. Analisis Faktor Penyebab Keterlambatan Penyelesaiaan Proyek Gedung. Tesis. Universitas Diponegoro, Semarang. (2010) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.