Open Access
Issue
MATEC Web Conf.
Volume 277, 2019
2018 International Joint Conference on Metallurgical and Materials Engineering (JCMME 2018)
Article Number 03013
Number of page(s) 8
Section Material and Mechanics
DOI https://doi.org/10.1051/matecconf/201927703013
Published online 02 April 2019
  1. Harbans Singh K.S. 2003. Enginerring and Construction Contracts Management. Post-Commencement Practise. Ed. ke-2. Malaysia: Penerbit LexisNexis, A Devision of Reed Elsevier (Singpore) Pte Ltd.: 423-555. [Google Scholar]
  2. Fisk, E.R. 2013. Construction Project Administration, edisi kesepuluh. Prentice Hall, Upper Saddle River, New Jersey, United Stated. [Google Scholar]
  3. O’Brien J.J. 1998. Construction Change Orders. McGraw-Hill, New York. [Google Scholar]
  4. Arain, F.M., & Pheng, L.S. (2005). The potential effects of variation orders on institutional buildings projects. Facilities. 23(11/12): 496-510. [CrossRef] [Google Scholar]
  5. Thomas, H.R., & Napolitan,C.L. 1995. Quantitave effects of construction changes on labor productivity. The Journal of Construction Engineering and Management-ASCE. September, 121(3): 290-296. [CrossRef] [Google Scholar]
  6. Clough R.H., & Sears G.A 1994. Construction Contracting, edisi keenam. John Wiley and Sons Inc., New York. [Google Scholar]
  7. Mokhtar, A., Bedard, C., & Fazio, P. 2000. and scheduling of interrelated design changes. J. Archit. Eng. ASCE, 6(2): 66-75. [CrossRef] [Google Scholar]
  8. Gray, C, & W. Hughes. 2001. Building Design Management. Butterworth Heinemann, Oxford, UK. [Google Scholar]
  9. Arain, F.M., Assaf, A.,S., & Low, S.P. 2004. Causes of discrepancies between design and construction. Architectural Science Review. 47(3): 237-249. [CrossRef] [Google Scholar]
  10. Pourrostam, T., Ismail, A., & Mansournejad, M. 2011. Identification and Evaluation of Causes and Effects of Change Orders in Building Construction Projects. Applied Mechanics and Materials 94-96: 2261-2264. [CrossRef] [Google Scholar]
  11. Ismail, A., Pourrostam, T., Soleymanzadeh, A., & Ghouyounchizad, M. 2012. Factors causing variation orders and their effects in roadway construction projects. Research Journal of Applied Sciences, Engineering and Technology. 4(23): 4969-4972. [Google Scholar]
  12. Rashid, K.A. 2002. Construction Procurement in Malaysia, Process and Systems, Constraints and Strategies. Gombak: IIUM Press. First Edit.: 1-191. [Google Scholar]
  13. Asamaoh, R.O., & Offei-Nyako, K. 2013. Variation Determinants in Building Construction: Ghanaian Professionals Perspective. Korea Institute of construction Engineering and Management (KICEM), Journal of Construction Engineering and Project Management 3(4): 20-25. [CrossRef] [Google Scholar]
  14. Memon, A.H., Rahman, I,A, & Abul Hasan, M.F. 2014. Significant causes and effects of variation orders in construction projects. Research Journal of Applied Sciences, Engineering and Technology. 7(21): 4494-4502 [CrossRef] [Google Scholar]
  15. Gokulkarthi, M., & Gowrishankar, K.S. 2015. A Study On Impacts Of Change Order In Construction Projects. International Journal of Science and Engineering Research (IJ0SER) 3(4): 3221 5687-3221 5693 [Google Scholar]
  16. Msallam, M., Abojaradeh, M., Jrew, B., & Zak, I. 2015. Controlling Of Variation Orders in Highway Projects in Jordan. Journal of Engineering and Architecture 3(2):95-104 [CrossRef] [Google Scholar]
  17. Hanif, H., Khurshid, M.B., Nauman, S., & Lindhard, S. 2016. Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries. Penerbit Universiti Sains Malaysia.: Pg. 1-20 [Google Scholar]
  18. (CII) Construction Industry Institute. 1990b. Scope definition and control. Publication 6-2, CII, The University of Texas at Austin, Austin, Tex [Google Scholar]
  19. Rashid, I. A., Mohamed, A. E-M., & Mohammed, E. A-H. 2012. The Impact of Change Orders on construction projects Sports Facilities Case Study. Journal of American Science. 8(8): 628-631 [Google Scholar]
  20. Ibbs, W. & Allen, W. E. 1995. Quantitative impacts of project change. Source Document 108, Construction Industry Institute, University of Texas at Austin, Austin, Tex [Google Scholar]
  21. Chappell, D., & Willis, A. 2005. The Architect in practice. Edisi kesembilan, Blackwell Science, Oxford, U.K. [Google Scholar]
  22. (CII) Construction Industry Institute. 1986. Constructability: A Primer. Construction Industry Institute, The University of Texas at Austin, TX [Google Scholar]
  23. (CII) Construction Industry Institute. 1994b. Project change management. University of Texas at Austin, Austin, Tex [Google Scholar]
  24. Dell’Isola, A. J. 1982. Value engineering in the construction industry. 3rd Ed., Van Nostrand Reinhold, New York [Google Scholar]
  25. Geok, O. S. 2002. Causes and improvement for quality problems in design and build projects. Unpublished B.Sc. thesis, National University of Singapore, Singapore. [Google Scholar]
  26. Arain, F.M. 2002. Design-construction interface dissonances. Thesis, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia [Google Scholar]
  27. Kaming, P.F., Olomolaiye, P.O., Holt, G.D., & Harris, F.C. 1997. Factors influencing construction time and cost overruns on high rise projects in Indonesia. Construction Management and Economics. 15(1):83-94 [CrossRef] [Google Scholar]
  28. Arain, F.M., & Pheng, L.S. 2006. Developers’ views of potential causes of variation orders for institutional buildings in Singapore. Architectural Science Review. 49(1):59-74. [CrossRef] [Google Scholar]
  29. Dickson, O.D., Gerryshom, M., & Wanyona, G. 2014. Factors Contributing to Variations Construction Projects in Kenya. International Journal of Social Science and Enterpreneurship. 1(13):1-11 [Google Scholar]
  30. Desai, J.N., Pitroda, J., & Bhavsar, J.J. 2015. A Review on Change Order and Assessing Causes Affecting Change Order in Construction. Journal of International Academic Research for Multidisciplinary. 2(12) January 2015: 152-162 [Google Scholar]
  31. Acharya, N.K., Lee, Y.D., & Im, H.M. 2006. Design Errors: Tragic for the Clients. Journal of Construction Research. 7(1/2): 177-190. [CrossRef] [Google Scholar]
  32. Al-nuaimi, A.S., Taha, R., Al Mohsin, M., & Al-Harthi, A.S. 2010. Causes, effects, benefits and remedies of change orders on public construction project in Oman. Journal of Construction Engineering and Management. 136(5): 615-622. [CrossRef] [Google Scholar]
  33. Levy, S.M. 2002. Project Management in Construction, 4th Ed. Columbus: McGraw-Hill [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.