Open Access
Issue
MATEC Web Conf.
Volume 276, 2019
International Conference on Advances in Civil and Environmental Engineering (ICAnCEE 2018)
Article Number 02012
Number of page(s) 10
Section Construction Management
DOI https://doi.org/10.1051/matecconf/201927602012
Published online 15 March 2019
  1. N. Allouche, A. Gilcrist, Quantifying construction related social costs (North American Society for Trenchless Technology (NASTT), New Orleans, 2004) [Google Scholar]
  2. W. Borchartdt, G. Pesti, D. Sun, L. Ding, Capacity and road user cost analysis of selected freeway work zones in Texas Report 0-5619-1 (Texas Transportation Institute, Texas, 2009) [Google Scholar]
  3. D.K. Sudarsana, H. Sulistio, A. Wicaksono, L. Djakfar, Prosiding Forum Studi Transportasi antar Perguruan Tinggi ke-16 (2013) [Google Scholar]
  4. D.K. Sudarsana, H. Sulistio, A. Wicaksono, L. Djakfar, Adv. in Nat. Appl. Sci. 8, 3 (2014) [Google Scholar]
  5. D.K. Sudarsana, Model kerugian pengguna jalan pada masa pelaksanaan proyek peningkatan jalan (Disertasi, Universitas Brawijaya Malang, 2014) [Google Scholar]
  6. Anonim, PESTLE analysis, Available at: http://pestleanalysis.com/what-is-pestle-analysis/ (2018) [Google Scholar]
  7. A. Costa, Components of a PESTLE analysis, Avail at: http://www.brighthubpm.com/project-planning/51754-components-of-a-pestle-analysis/ (2018) [Google Scholar]
  8. D. Hilson, Proc. of PMI Global Congress 2014-EMEA (2014) [Google Scholar]
  9. A. Ferdinan, Metode penelitian manajemen: Pedoman penelitian untuk penulisan skripsi, tesis dan disertasi ilmu manajemen (Badan Penerbit Universitas Diponogoro, Semarang, 2011) [Google Scholar]
  10. R. Flanagan, G. Norman, Risk managent and construction (Wiley, New Jersey, 1993,) [Google Scholar]
  11. I.N. Norken, I.B.N. Purbawijaya, I.G.N.O. Suputra, Pengantar analisis dan manajemen risiko pada proyek konstruksi (Universitas Udayana Press, Denpasar, 2015) [Google Scholar]
  12. P.S. Godfrey, W.H. Sir, Control of risk: A guide to systematic management of risk from construction (CIRIA, London, 1996) [Google Scholar]
  13. OKTC, Evaluation of construction strategies for PCC pavement rehabilitation projects Report OTCREOS7 1-23-F, (Oklahoma Transportation Center, Oklahama, 2010) [Google Scholar]
  14. E. Prihartanto, J of Res. and Tech. 2, 1 (2016) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.