Open Access
Issue
MATEC Web Conf.
Volume 266, 2019
International Conference on Built Environment and Engineering 2018 - “Enhancing Construction Industry Through IR4.0” (IConBEE2018)
Article Number 01024
Number of page(s) 8
Section Sustainable Construction and Built Environment (SCBE)
DOI https://doi.org/10.1051/matecconf/201926601024
Published online 20 February 2019
  1. A. P. C. Chan and A. P. L. Chan, "Key performance indicators for measuring construction success," Benchmarking An Int. J., vol. 11, no. 2, pp. 203-221, 2004. [CrossRef] [Google Scholar]
  2. I. M. Shohet, "Key performance indicators for maintenance of health-care facilities," Faciiities, vol. 21, no. 1/2, pp. 5-12, 2003. [Google Scholar]
  3. A. J. Nurul, M. Y. Aminah, I. Syuhaida, and C. S. Chai, "Public construction projects performance in Malaysia," J. Southeast Asian Res., vol. 2016, no. 2016, pp. 1-29, 2016. [Google Scholar]
  4. L. Zhang and W. Fan, "Improving performance of construction projects," Eng. Constr. Archit. Manag., vol. 20, no. 2, pp. 195-207, Feb. 2013. [Google Scholar]
  5. H. Doloi, "Assessing stakeholders’ influence on social performance of infrastructure projects," Faciliities, vol. 30, no. 11, pp. 531-550, Aug. 2012. [CrossRef] [Google Scholar]
  6. H. Yao, L. Shen, Y. Tan, and J. Hao, "Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects," Autom. Constr., vol. 20, no. 8, pp. 1060-1069, Dec. 2011. [CrossRef] [Google Scholar]
  7. H. Yao, L. Shen, Y. Tan, and J. Hao, "Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects," Autom. Constr., vol. 20, no. 8, pp. 1060-1069, Dec. 2011. [CrossRef] [Google Scholar]
  8. F. Y. Y. Ling, Y. Ke, M. M. Kumaraswamy, M. Asce, and S. Wang, "Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China," J. Constr. Eng. Manag., vol. 142, no. March, pp. 1-12, 2013. [Google Scholar]
  9. A. Amiril, A. H. Nawawi, R. Takim, S. Nur, and F. Ab, "Transportation Infrastructure Project Sustainability Factors and Performance," Procedia - Soc. Behav. Sci. vol. 153, pp. 90–98, 2014. [CrossRef] [Google Scholar]
  10. P. Doan and K. Menyah, "Impact of Irreversibility and Uncertainty on the Timing of Infrastructure Projects," J. Constr. Eng. Manag., vol. 139, no. MARCH, pp. 331-338, 2013. [CrossRef] [Google Scholar]
  11. C. C. Cantarelli, B. van Wee, E. J. E. Molin, and B. Flyvbjerg, "Different cost performance: different determinants?," Transp. Policy, vol. 22 pp. 88-95, Jul. 2012. [CrossRef] [Google Scholar]
  12. S. Verweij, I. van Meerkerk, and I. a. Korthagen, "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transp. Policy, vol. 37, pp. 195-202, Jan. 2015. [CrossRef] [Google Scholar]
  13. K. C. Iyer and K. N. Jha, "Factors affecting cost performance: Evidence from Indian construction projects," Int. J. Proj. Manag. vol. 23, no. 4, pp. 283-295, 2005. [CrossRef] [Google Scholar]
  14. R. Takim and A. Akintoye, "Performance Indicators for Successful Construction Project Performance," Assoc. Res. Constr. Manag., vol. 2, no. September, pp. 2-4, 2002. [Google Scholar]
  15. M. A. N. Masrom, M. H. I. A. Rahim, S. Mohamed, G. K. Chen, and R. Yunus, "Successful Criteria for Large Infrastructure Projects in Malaysia," Procedia Eng., vol. 125, no. September, pp. 143-149, 2015. [CrossRef] [Google Scholar]
  16. S. Demirkesen and B. Ozorhon, "Assessing the Impact of Project Characteristics on Construction Project Success," 12th Int. Congr. Adv. Civ. Eng. ACE2016., pp. 1-8, 2016. [Google Scholar]
  17. K. Cho, T. Hong, and C. Hyun, "Effect of project characteristics on project performance in construction projects based on structural equation model," Expert Syst. Appl. vol. 36, no. 7, pp. 10461-10470, 2009. [CrossRef] [Google Scholar]
  18. A. Shah Ali, S. Nizam Kamaruzzaman, and H. Salleh, "The characteristics of refurbishment projects in Malaysia," Facilities, vol. 27, no. 1/2, pp. 56-65, 2009. [CrossRef] [Google Scholar]
  19. Molenaar, Keith & D. Songer, Anthony. (1998). Model for Public Sector Design-Build Project Selection. Journal of Construction Engineering and Management. 124. 467-479. 10.1061/(ASCE)0733-9364(1998)124:6(467). [CrossRef] [Google Scholar]
  20. Kaming, P.F., Olomolaiye, P.O., Holt, G.D. and Harris, F. (1997), "Factors influencing construction time and cost overruns on high- rise projects in Indonesia", Construction Management and Economics, vol. 15, pp. 83-94. [Google Scholar]
  21. Williamson, O.E., 1985. The Economic Institutions of Capitalism: Firms, Markets, Relational Contracting. Free Press, New York. [Google Scholar]
  22. Bresnen, M. and Marshall, N. (2000), "Motivation, commitment and the use of incentives in partnerships and alliances", Construction Management and Economics, vol. 18, pp. 587-98. [CrossRef] [Google Scholar]
  23. S. O. Cheung and T. W. Yiu, "Are construction disputes inevitable?," IEEE Trans. Eng. Manag., vol. 53, no. 3, pp. 456–470, 2006. [CrossRef] [Google Scholar]
  24. W. Lu, L. Zhang, and L. Zhang, "Effect of Contract Completeness on Contractors’ Opportunistic Behavior and the Moderating Role of Interdependence," J. Constr. Eng. Manag., vol. 142, no. 6, p. 4016004, 2016. [CrossRef] [Google Scholar]
  25. R. Rameezdeen and A. Rodrigo, "Modifications to standard forms of contract: The impact on readability," Australas. J. Constr. Econ. Bulld. vol. 14, no. 2, pp. 31-40, 2014. [Google Scholar]
  26. S. Toor and S. O. Ogunlana, "Construction professionals’ perception of critical success factors for large-scale construction projects," Constr. Innov., vol. 9, no. 2, pp. 149-167, Apr. 2009. [Google Scholar]
  27. N. Jaffar, a. H. A. Tharim, and M. N. Shuib, "Factors of Conflict in Construction Industry: A Literature Review," Procedia Eng., vol. 20, pp. 193-202, 2011. [Google Scholar]
  28. M. Sambasivan and Y. W. Soon, "Causes and effects of delays in Malaysian construction industry," Int. J. Proj. Manag., vol. 25, no. 5, pp. 517-526, 2007. [Google Scholar]
  29. A. R. Chini and H. E. Valdez, "ISO 9000 and the U. S. Construction Industry," J. Manag. Eng. vol. 19, no. 2, pp. 69-77, 2003. [Google Scholar]
  30. Ling, F. Y. Y., Ke, Y., Kumaraswamy, M. M., Asce, M., & Wang, S. (2013). Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 142(March), 1-12. https://doi.org/10.1061/(ASCE)C0.1943-7862 [Google Scholar]
  31. K. E. Papke-Shields, C. Beise, and J. Quan, "Do project managers practice what they preach, and does it matter to project success?," Int. J. Proj. Manag., vol. 28, no. 7, pp. 650-662, Oct. 2010 [Google Scholar]
  32. Skamris, M.K., Flybjerg, B., 1997. Inaccuracy of traffic forecasts and cost estimates on large transport projects. Transport policy 4 (3), 11–146. [CrossRef] [Google Scholar]
  33. Pickrell, D.H., 1990. Urban rail transit projects: forecasts versus actual ridership and cost. US Department of Transportation, Washington [Google Scholar]
  34. Rwelamila, P.D. and Hall, K.A. (1995), "Total systems intervention: an integrated approach to time, cost and quality management", Construction Management and Economics, vol. 13, pp. 235-41. [CrossRef] [Google Scholar]
  35. Assaf, S.A. & Al-Hejji, S. (2006). Causes of delay in large construction projects International Journal of Project Management, 24, 349–357. [Google Scholar]
  36. Frimpong, Y., Oluwoye, J. and Crawford, L. (2003), "Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study", International Journal of Project Management, vol. 21, pp. 321-6. [CrossRef] [Google Scholar]
  37. Nkado, R.N. (1995), "Construction time-influencing factors: the contractor’s perspective", Construction Management and Economic, vol. 13, pp. 81–9. [CrossRef] [Google Scholar]
  38. Mezher, T. and Tawil, W. (1998), "Causes of delays in the construction industry in Lebanon", Engineering, Construction and Architectural Management, Vol. 5 No. 3, pp. 252-60. [CrossRef] [Google Scholar]
  39. Okpala, D.C. and Aniekwu, A.N. (1988), "Causes of high costs of construction in Nigeria", Journal of Construction Engineering and Management, Vol. 114 No. 2, pp. 233-44. [CrossRef] [Google Scholar]
  40. Elinwa, A.U. and Joshua, M. (2001), "Time- overruns factors in Nigerian construction industry", Journal of Construction Engineering and Management, Vol. 127 No. 5, pp. 419-25. [CrossRef] [Google Scholar]
  41. Al-Momani, A.H. (2000). Examining service quality within construction processes, Journal of Technovation, 20, 643–651. [CrossRef] [Google Scholar]
  42. Bowen, P.A., Cattel, K.S., Hall, K.A, Edwards, P.J. & Pearl, R.G. (2002). Perceptions of time, cost and quality management on building projects, Australian Journal of Construction Economics and Building, 2 (2), 48–56. [CrossRef] [Google Scholar]
  43. I. Rahmat and A. S. Ali, "The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects," J. Build. Apprais. vol. 5, no. 3, pp. 273-288, 2010. [CrossRef] [Google Scholar]
  44. B. Liu, T. Huo, Y. Liang, Y. Sun, and X. Hu, "Key Factors of Project Characteristics Affecting Project Delivery System Decision Making in the Chinese Construction Industry: Case Study Using Chinese Data Based on Rough Set Theory," J. Prof. Issues Eng. Educ. Pract. vol. 137, no. January, pp. 206-210, 2012. [Google Scholar]
  45. A. A. Othman, J. V. Torrance, and M. A. Hamid, "Factors influencing the construction time of civil engineering projects in Malaysia," Eng. Constr. Archit. Manag., vol. 13, no. 5, pp. 481-501, 2006. [Google Scholar]
  46. Pena-Mora, F, Sosa, C.E. & McCone, D.S. (2003). Introduction to construction dispute resolution. New Jersey: Prentice Hall. [Google Scholar]
  47. M. Chan, Y. Li, and H. Besar, "New Engineering Contract ( Nec ) 1993 As Radical Changes To the Malaysian Standard Forms of Contract, Unpublished Master Tesis," Univ. Teknol. Malaysia, 2006. [Google Scholar]
  48. Harban Singh, K.S. (2011). The PAM Contract 2006: An overview professional & the JKR Forms (Rev. 2007). 1-day Seminar, Board of Quantity Surveyors Malaysia, March 2011. [Google Scholar]
  49. W. Hughes etal. "Construction contract policy: do we mean what we say?," RICS Found. Res. Pap. Ser. vol. 4, no. 12, 2002. [Google Scholar]
  50. X. H. Jin and G. Zhang, "Modelling optimal risk allocation in PPP projects using artificial neural networks," Int. J. Proj. Manag., vol. 29, no. 5, pp. 591-603, 2011. [CrossRef] [Google Scholar]
  51. F. Nasirzadeh, M. Khanzadi, and M. Rezaie, "Dynamic modeling of the quantitative risk allocation in construction projects," Int. J. Proj. Manag., vol. 32, no. 3, pp. 442-451, 2014. [CrossRef] [Google Scholar]
  52. W. Alaghbari, M. Razali A. Kadir, A. Salim, and Ernawati, "The significant factors causing delay of building construction projects in Malaysia," Eng. Constr. Archtt. Manag., vol. 14, no. 2, pp. 192-206, 2007. [Google Scholar]
  53. I. El-adaway, S. Fawzy, H. Burrell, and N. Akroush, "Studying Payment Provisions under National and International Standard Forms of Contracts," J. Leg. Aff. Disput. Resolut. Eng. Constr., no. July, p. 4516011, 2016. [Google Scholar]
  54. H. Adnan, N. Hashim, N. Mohd, Yusuwan, and N. Ahmad, "Ethical Issues in the Construction Industry: Contractor’s Perspective," Procedia - Soc. Behav. Sci. vol. 35, no. December 2011, pp. 719-727, 2012. [CrossRef] [Google Scholar]
  55. L. Guo, H. Li, P. Li, and C. Zhang, "Transaction costs in construction projects under uncertainty," Kybernetes, vol. 45, no. 6, pp. 866-883, Jun. 2016. [CrossRef] [Google Scholar]
  56. H. Y. Chong and R. M. Zin, "A case study into the language structure of construction standard form in Malaysia," Int. J. Proj. Manag., vol. 28, no. 6, pp. 601-608, 2010. [CrossRef] [Google Scholar]
  57. A. A. Bubshait and S. A. Almohawis, "Evaluating the general conditions of a construction contract," Int. J. Proj. Manag. vol. 12, no. 3, pp. 133-136, 1994. [CrossRef] [Google Scholar]
  58. N. A. N. A. Ali and S. Wilkinson, "Modernising construction contract drafting - A plea for good sense," Proc. 18th CIB World Build. Congr., pp. 323-345, 2010. [Google Scholar]
  59. J. N. Wright and W. Fergusson, "Benefits of the NEC ECC form of contract: A New Zealand case study," Int. J. Proj. Manag., vol. 27, no. 3, pp. 243-249, 2009. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.