Open Access
Issue
MATEC Web Conf.
Volume 258, 2019
International Conference on Sustainable Civil Engineering Structures and Construction Materials (SCESCM 2018)
Article Number 02017
Number of page(s) 9
Section Construction Management, Construction Method and System, Optimization and Innovation in Structural Design
DOI https://doi.org/10.1051/matecconf/201925802017
Published online 25 January 2019
  1. Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK Guide) (2013) [Google Scholar]
  2. H. Abou-Senna, E. Radwan, A. Navarro, H. Abdelwahab, J. Traf and Transport. Eng. (to be published) [Google Scholar]
  3. K. Parvan, H. Rahmandad, A. Haghani, International System Dynamics Conference (2012) [Google Scholar]
  4. Y. J. Shen, D. H. T. Walker, The TQM Mag 13, 247–259 (2001) [CrossRef] [Google Scholar]
  5. C. Hendrikson, T. Au, Project Management for Construction - Fundamental Concepts for Owners, Engineers, Architects and Builders (1989) [Google Scholar]
  6. C. Allen, J. Smallwood, J. Eng. Des. And Tech 6 (1), 7–20 (2008) [Google Scholar]
  7. I. Aje, ECAM 19 (2), 159–172 (2012) [CrossRef] [Google Scholar]
  8. M. Wala, B. F. Sompie, R. J. M. Mandagi, Media Eng 3, 99–108 (2013) [Google Scholar]
  9. A. S. Oyegoke, M. Dickinson, M. M. A. Khalfan, P. McDermott, S. Rowlinson, Int. J. Managing Proj in Buss 2, 338–354 (2009) [CrossRef] [Google Scholar]
  10. B. Trigunarsyah, A. A. D. Parami Dewi, Proceedings of the Institution of Civil Engineers (2014) [Google Scholar]
  11. D. Willar, The TQM J 29, 369–384 (2017) [CrossRef] [Google Scholar]
  12. O. Barima, S. M. Rowlinson, ECAM 17, 197–209 (2010) [CrossRef] [Google Scholar]
  13. L. Zhang, W. Fan, ECAM 20, 195–207 (2013) [CrossRef] [Google Scholar]
  14. D. A. Abowitz, T. M. Toole, J. Const Eng and Mgmt 136, 108–116 (2010) [Google Scholar]
  15. S. S. Grobbelar, R & D in the National System of Innovation: A System Dynamic Model (2007) [Google Scholar]
  16. M. J. Clayton, Ed. Psych. 17, 4 (1997) [Google Scholar]
  17. G. Rowe, G. Wright, Principle of Forecasting 125–144 (2001) [Google Scholar]
  18. U. Sekaran, R. Bougie, Research methods for business: A skill-building approach (2009) [Google Scholar]
  19. A. V. Alexandrov, P. M. Pullicino, E. M. Meslin, J. W. Norris, Stroke 27, 232–237 (1996) [CrossRef] [Google Scholar]
  20. A. A. D. Parami Dewi, Framework for Implementing Design Build Project Delivery System in Road Infrastructure Projects in Indonesia (2013) [Google Scholar]
  21. H. Hoeber, D. Alsem, ECAM 23, 696–708 (2016) [CrossRef] [Google Scholar]
  22. A. M. Adriaanse, Bruggen bouwen met ICT (2014) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.