Open Access
Issue
MATEC Web Conf.
Volume 230, 2018
7th International Scientific Conference “Reliability and Durability of Railway Transport Engineering Structures and Buildings” (Transbud-2018)
Article Number 03009
Number of page(s) 6
Section Construction Materials, Protection and Repair of Structures and Buildings
DOI https://doi.org/10.1051/matecconf/201823003009
Published online 16 November 2018
  1. V. Braun, Raskhod armatury v zhelezobetonnykh konstruktsiyakh (Stroyizdat, Moscow, 1993) [Google Scholar]
  2. A.S. Salov, L.I. Khabibullina, A.I. Gabitov, E.A. Udalova, V.A. Timofeev, A.A. Timofeev, Istoriya nauki i tekhniki, 11, 37-43 (2017) [Google Scholar]
  3. A.I. Bedov, V.V. Babkov, A.I. Gabitov, A.S. Salov, Vestnik MGSU, 8, 76-84 (2012) [CrossRef] [Google Scholar]
  4. V.I. Vinnichenko, A.N. Ryazanov, MATEC Web of Conferences 116, 01020 (2017). [CrossRef] [EDP Sciences] [Google Scholar]
  5. V.I. Vinnichenko, A.N. Ryazanov, N.Y. Vitsenko, Construction materials, 10, 76-83 (2016) [Google Scholar]
  6. A.I. Bedov, A.M. Gaysin, A.I. Gabitov, Textile industry technology, 3(369), 231-236 (2017) [Google Scholar]
  7. A.I. Bedov, A.S. Salov, V.V. Babkov, A.I. Gabitov, I.V. Nedoseko, Current problems for calculation of reinforced concrete constructions, buildings and structures for emergency impact, 503-507 (2016) [Google Scholar]
  8. A.N. Ryazanov, V.I. Vinnichenko, I.V. Nedoseko, V.A. Ryazanova, A.A. Ryazanov, Construction materials 1-2, 18-22 (2018) [Google Scholar]
  9. S.H. Aminov, I.B. Strugovec, I.V. Nedoseko, V.P. Klimov, V.V. Babkov, Culvert pipes for asphalt concrete roads, 10, 2 (2003) [Google Scholar]
  10. A.M. Gaisin, V.V. Babkov, Construction materials, 1, 55-58 (2016) [Google Scholar]
  11. A.G. Tamrazyan, Concrete and reinforced concrete: problems and prospects, 7, 51-54 (2014) [Google Scholar]
  12. D.N. Sursanov, A.B. Ponomaryov, Bulletin of National Research Perm Polytechnic University Construction and Architecture, 4, 144-165 (2015) [CrossRef] [Google Scholar]
  13. A.I. Bedov, A.I. Gabitov, A.S. Salov, A.M. Gaisin, L.I. Khabibullina, Building and reconstruction, 6(74), 3-12 (2017) [Google Scholar]
  14. A.A. Semenov, A.I. Gabitov, Static analysis, 1, 152 (2005) [Google Scholar]
  15. A.I. Bedov, A.S. Salov, A.I. Gabitov, D.V. Kuznetsov, E.A. Sadykova, International Journal for Computational Civil and Structural Engineering, 13 No. 4, 37-46 (2017) [CrossRef] [Google Scholar]
  16. A.M. Gaisin, S.Y. Samokhodova, I.V. Nedoseko, A.Y. Paymetkina, Residential construction, 5, 36-40 (2016) [Google Scholar]
  17. V.G. Batrakov, Concrete modifiers: new opportunities and prospects, 10, 4-7 (2006) [Google Scholar]
  18. S.S. Kaprielov, V.I. Travush, N.I. Karpenko, A.V. Sheynfel’d. Modified concretes of a new generation in the Moscow-City construction sites. Part I, 10, 13-17 (2006) [Google Scholar]
  19. S.I. Kryshov, I.S. Kurilyuk, Housing construction, 7, 3-5 (2016) [Google Scholar]
  20. A.M. Gaisin, R.R. Gareev, V.V. Babkov, I.V. Nedoseko, S.Y. Samokhodova, Construction materials, 4, 82-86 (2015) [Google Scholar]
  21. A.N. Ryazanov, V.I. Vinnichenko, Bulletin of Voronezh State Technological University, 9 No 6-2, 22-24 (2013) [Google Scholar]
  22. V.I. Kalashnikov, Calculation of high-strength self-compacting concrete compositions, 10, 4-6 (2008) [Google Scholar]
  23. V.I. Vinnichenko, A.N. Ryazanov. Ecological indices of manufacture of Portland cement clinker and production of the dolomite clinker C. 01020 (2017) [Google Scholar]
  24. A.N. Ryazanov, V.I. Vinnichenko, News of Higher Educational Institutions. North Caucasian Region. Series: Technical Sciences, 1(176), 115-117 (2014) [Google Scholar]
  25. D. Balageas, C.P. Fritzen, A. Guemes, Structural Health Monitoring, 496 (2006) [Google Scholar]
  26. G. Clark. Challenges for concrete in tall, 7, 103-112 (2014) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.