Open Access
Issue |
MATEC Web Conf.
Volume 230, 2018
7th International Scientific Conference “Reliability and Durability of Railway Transport Engineering Structures and Buildings” (Transbud-2018)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 6 | |
Section | Railways, Subways and Industrial Transport | |
DOI | https://doi.org/10.1051/matecconf/201823001015 | |
Published online | 16 November 2018 |
- V. Shulga, V. Novakovich, V. Laptev. Track and track facilities. 9, 28-31. (1981) [Google Scholar]
- V. Novakovich Besstykovoy zheleznodorozhnyy put’ s rel’sovymi pletyami neogranichennoy dliny (Lvov, Vysshaya shkola, 1984) [Google Scholar]
- N. Vinogorov, A. Lugovoi, V. Sushkov, V. Shramenko Track and track facilities. 9, 23-24. (1988) [Google Scholar]
- V. Sushkov, V. Shramenko Collection of scientific papers HIIT. 5, 33-37. (1988) [Google Scholar]
- Instruktivnyye materialy po svarochno-naplavochnym rabotam v putevom khozyaystve (Moskow, Transport, 1991) [Google Scholar]
- I. Voznenko Bezstikova kolіya with rakami neobmezhenoї dovzhini (Khakiv, KharDAZT, 1998) [Google Scholar]
- Z. Kreynis, N. Seleznyova Besstykovyy put’. Kak remontirovat’ besstykovyy put’ (Moskow, Marshrut, 2005) [Google Scholar]
- Tekhnichni vkazivky po ulashtuvannyu, remontu i utrymannyu bezstykovoyi koliyi na zaliznytsyakh Ukrayiny (Kyiv, 2012) [Google Scholar]
- G. Dwight Tables of integrals and other mathematical formulas (1997) [Google Scholar]
- I. Bronshtein, K. Semendyaev For engineers and students of universities (1962) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.