Open Access
Issue
MATEC Web Conf.
Volume 203, 2018
International Conference on Civil, Offshore & Environmental Engineering 2018 (ICCOEE 2018)
Article Number 02004
Number of page(s) 8
Section Construction and Project Management
DOI https://doi.org/10.1051/matecconf/201820302004
Published online 17 September 2018
  1. M. Sambasivan, Y.W. Soon, Causes and effects of delays in Malaysian construction industry. International Journal of project management, 2007. 25(5): p. 517-526. [Google Scholar]
  2. W.e. Alaghbari, et al., The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 2007. 14(2): p. 192-206. [Google Scholar]
  3. W.S. Alaloul, M.S. Liew, and N.A.W.A. Zawawi, Identification of coordination factors affecting building projects performance. Alexandria Engineering Journal, 2016. 55(3): p. 2689-2698. [Google Scholar]
  4. L. Le-Hoai, Y. Dai Lee, and J.Y. Lee, Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE journal of civil engineering, 2008. 12(6): p. 367-377. [Google Scholar]
  5. W.S. Alaloul, M.S. Liew, and N.A.W.A. Zawawi. The characteristics of coordination process in construction projects. in Technology Management and Emerging Technologies (ISTMET), 2015 International Symposium on. 2015. IEEE. [Google Scholar]
  6. A.H. Memon, et al., Factors affecting construction cost in Mara large construction project: Perspective of project management consultant. International Journal of Sustainable Construction Engineering and Technology, 2011. 1(2): p. 41-54. [Google Scholar]
  7. S.H. Shuit, et al., Oil palm biomass as a sustainable energy source: A Malaysian case study. Energy, 2009. 34(9): p. 1225-1235. [Google Scholar]
  8. O.J. Ameh and E.E. Osegbo, Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management, 2011. 1(1): p. 56-67. [CrossRef] [Google Scholar]
  9. W.S. Alaloul, M.S. Liew, and N. Zawawi. Coordination process in construction projects management. in Engineering Challenges for Sustainable Future: Proceedings of the 3rd International Conference on Civil, Offshore and Environmental Engineering (ICCOEE 2016, Malaysia, 15-17 Aug 2016). 2016. CRC Press. [Google Scholar]
  10. W.S. Alaloul, M.S. Liew, and N.A.W.A. Zawawi, Journal of Applied Science and Agriculture. [Google Scholar]
  11. W.S. Alaloul, M.S. Liew, and N.A.W. Zawawi. Communication, coordination and cooperation in construction projects: business environment and human behaviours. in IOP Conference Series: Materials Science and Engineering. 2017. IOP Publishing. [Google Scholar]
  12. W.S. Alaloul, M.S. Liew, and N.A.B. Zawawi. AFramework for Coordination Process into Construction Projects. in MATEC Web of Conferences. 2016. EDP Sciences. [Google Scholar]
  13. C.H. Teoh, Key sustainability issues in the palm oil sector. 2010, A discussion paper for multi-stakeholders consultations (Commissioned by the World Bank Group). [Google Scholar]
  14. P.F. Kaming, et al., Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management & Economics, 1997. 15(1): p. 83-94. [Google Scholar]
  15. A.H. Memon, I.A. Rahman, and A.A.A. Azis, Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences, 2012. 1(1): p. 45-52. [CrossRef] [Google Scholar]
  16. W. Alaloul, M. Liew, and N. Zawawi. Attributes of coordination process in construction projects. in Engineering Challenges for Sustainable Future: Proceedings of the 3rd International Conference on Civil, Offshore and Environmental Engineering (ICCOEE 2016, Malaysia, 15-17 Aug 2016). 2016. CRC Press. [Google Scholar]
  17. S.T. Kometa, P.O. Olomolaiye, and F.C. Harris, Attributes of UK construction clients influencing project consultants’ performance. Construction Management and Economics, 1994. 12(5): p. 433-443. [Google Scholar]
  18. N. Hamzah, et al., Cause of construction delay-Theoretical framework. Procedia Engineering, 2011. 20: p. 490-495. [CrossRef] [Google Scholar]
  19. D.W. Chan, M.M. Kumaraswamy, An evaluation of construction time performance in the building industry. Building and Environment, 1996. 31(6): p. 569-578. [CrossRef] [Google Scholar]
  20. A.M. Odeh, H.T. Battaineh, Causes of construction delay: traditional contracts. International journal of project management, 2002. 20(1): p. 67-73. [Google Scholar]
  21. F.D. Fugar, A.B. Agyakwah-Baah, Delays in building construction projects in Ghana. Construction Economics and Building, 2010. 10(1-2): p. 103-116. [CrossRef] [Google Scholar]
  22. N.R. Mansfield, O. Ugwu, and T. Doran, Causes of delay and cost overruns in Nigerian construction projects. International journal of project Management, 1994. 12(4): p. 254-260. [CrossRef] [Google Scholar]
  23. W.S. Alaloul, et al., Delphi Technique Procedures: A New Perspective in Construction Management Research. Applied Mechanics & Materials, 2015. 802. [Google Scholar]
  24. J. Yang, and C. Yang, Determining schedule delay causes under the Build-Operate-Transfer model in Taiwan. 2010. [Google Scholar]
  25. S. Einarsen, H. Hoel, and G. Notelaers, Measuring exposure to bullying and harassment at work: Validity, factor structure and psychometric properties of the Negative Acts Questionnaire-Revised. Work & Stress, 2009. 23(1): p. 24-44. [CrossRef] [Google Scholar]
  26. A. Jokovic, et al., Validity and reliability of a questionnaire for measuring child oral-health-related quality of life. Journal of dental research, 2002. 81(7): p. 459-463. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.