Open Access
Issue |
MATEC Web Conf.
Volume 196, 2018
XXVII R-S-P Seminar, Theoretical Foundation of Civil Engineering (27RSP) (TFoCE 2018)
|
|
---|---|---|
Article Number | 04088 | |
Number of page(s) | 8 | |
Section | Building Materials, Technologies, Organization and Management in Construction | |
DOI | https://doi.org/10.1051/matecconf/201819604088 | |
Published online | 03 September 2018 |
- Polish Accounting Law, Ustawa z dnia 29 września 1994 r, o rachunkowości (Dz.U. 1994 Nr 121 poz 591) with subsequent changes [Google Scholar]
- M.M. Ahmed, N. Sultana, A.R. Khan, Md.S. Uddin, An Innovative Approach to Obtain an Initial Basic Feasible Solution for the Transportation Problems, Journal of Physical Sciences, Vol. 22, 2017, pp. 23-42 (2017) [Google Scholar]
- H. Anysz, The profit as in-company evaluation of the construction site effectiveness, MATEC Web of Conferences 117:00009, DOI: 10.1051/matecconf/201711700009 (2017) [CrossRef] [EDP Sciences] [Google Scholar]
- H. Anysz, The cost minimizing solution of the transportation problem for the location of the building machinery yard along the road under construction, Scientific Review Engineering and Environmental Sciences 27(1(79)) DOI: 10.22630/PNIKS.2018.27.1.3 (2018) [Google Scholar]
- S. Biruk, K.M. Jaworski, Z. Tokarski, Podstawy organizacji robót drogowych, Warszawa, Wydawnictwo Naukowe PWN (2009) [Google Scholar]
- O. Diaz-Parra, J.A. Ruiz-Vanoye, B.B.Loranca, A. Fuentes-Penna, R.A. Barrera-Cámara R.A., A Survey of Transportation Problems, Journal of Applied Mathematics, Vol. 2014, DOI: 10.1155/2014/848129 (2014) [CrossRef] [Google Scholar]
- K.M. Jaworski, Metodologia projektowania realizacji budowy, Warszawa, Wydawnictwo Naukowe PWN (2009) [Google Scholar]
- M.V. Książek, P.O. Nowak, S. Kivrak, J.H. Rosłon, L. Ustinovichius, Computer-aided decision-making in construction project development. Journal of civil engineering and management, 21(2), 248-259 (2015) [CrossRef] [Google Scholar]
- J. Rosłon, The multi-mode resource constrained project scheduling problem in construction. State of the art review and research challenges. Technical Transactions, Volume 5, pp. 67-74 (2017) [Google Scholar]
- J.Rosłon, Porównanie algorytmów genetycznego i przeszukiwania tabu wykorzystanych do szeregowania zadań w budownictwie (Comparison of the genetic and tabu search algorithms for the task execution in construction projects). Materiały Budowlane, 2016, DOI: 10.15199/33.2016.06.18 [Google Scholar]
- J. Rosłon, J. Zawistowski, Construction projects’ indicators improvement using selected metaheuristic algorithms, Procedia Engineering, 2016, 153, 595-598, [Google Scholar]
- I. Rybka, E. Bondar-Nowakowska, K. Pawluk, M. Połoński, Risk of contractors’ claims on the example of road works. IOP Conference Series: Materials Science and Engineering 2017, Vol. 245, art. 072009, s. 1-9, DOI: 10.1088/1757-899X/245/7/072009 (2017) [CrossRef] [Google Scholar]
- https://docs.oracle.com/cd/E57185_01/CBOUG/ch03.html - OptQuest Guidelines for Setting up and Optimizing a Model [Google Scholar]
- https://www.oracle.com/applications/crystalball/index.html [Google Scholar]
- https://www.oracle.com/applications/crystalball/decision-optimizer/index.html [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.