Open Access
Issue
MATEC Web Conf.
Volume 174, 2018
3rd Scientific Conference Environmental Challenges in Civil Engineering (ECCE 2018)
Article Number 01007
Number of page(s) 10
Section Sustainable Civil Engineering, Impact on Environment, Durability and Protection of Buildings and Structures, Energy Consumption in Civil Engineering, Unconventional Energy Sources
DOI https://doi.org/10.1051/matecconf/201817401007
Published online 26 June 2018
  1. Base Geotech Pty Ltd., Specification for Diaphgram Wall, (2012) [Google Scholar]
  2. R. Spruit, F. van Tol, W. Broere, E. Slob, E. Niederleithinger, Detection of anomalies in diaphragm walls with crosshole sonic logging, Canadian Geotechnical Journal, 51(4), p. 369-380, (2014) [CrossRef] [Google Scholar]
  3. I.H.Wong, Experience with waterproofness of basements constructed of concrete diaphragm walls in Singapore, Tunnelling and Underground Space Technology, 12, 4, p. 491-495, (1997) [CrossRef] [Google Scholar]
  4. W. Powrie, C. Kantartzi, Ground response during diaphragm wall installation in clay:centrifuge model tests, Géotechnique, 46, 4, p. 725-739, (1996) [CrossRef] [Google Scholar]
  5. PN-EN 1538:2002, Wykonawstwo specjalistycznych robót geotechnicznych. Ściany szczelinowe, (2002) [Google Scholar]
  6. M. Czopowska-Lewandowicz, Badania właściwości betonu w ścianach szczelinowych, 61. Konferencja naukowa KILiW i KN PZITB, Krynica (2015) [Google Scholar]
  7. M. Czopowska-Lewandowicz, Próby identyfikacji bentonitu w betonie ściany szczelinowej, Materiały Budowlane, 528, 8, p. 67-69, (2016) [Google Scholar]
  8. J.H. Dalen Van, J.W. Bosch, W. Broere, Concrete Flow in Diaphragm Wall Panels:A Full-Scale In-Situ Test, Geotechnical Risk and Safety V, Rotterdam (2015) [Google Scholar]
  9. PN-EN 206-1:2003, Beton. Cz.1: Wymagania, właściwości, produkcja i zgodność, (2003) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.