Open Access
Issue |
MATEC Web of Conferences
Volume 172, 2018
3rd International Conference on Design, Analysis, Manufacturing and Simulation (ICDAMS 2018)
|
|
---|---|---|
Article Number | 05002 | |
Number of page(s) | 6 | |
Section | Industrial Engineering | |
DOI | https://doi.org/10.1051/matecconf/201817205002 | |
Published online | 12 June 2018 |
- J. Mason, “Ean rimer,” Readings, no. c, pp. 1–46. [Google Scholar]
- L. Koskela, G. Ballard, G. Howell, and I. Tommelein, Des. Constr. Build. Value, no. December 2015, pp. 211–226, 2002. [Google Scholar]
- J. Salvatierra-Garrido and C. Pasquire, J. Financ. Manag. Prop. Constr., vol. 16, no. 1, pp. 8–18, 2011. [CrossRef] [Google Scholar]
- S. Mostafa, N. Chileshe, and T. Abdelhamid, Constr. Innov., vol. 16, no. 4, pp. 483–525, 2016. [CrossRef] [Google Scholar]
- O. Ogunbiyi, J. S. Goulding, and A. Oladapo, Constr. Innov., vol. 14, no. 1, pp. 88–107, 2014. [Google Scholar]
- G. J. Sweis, M. Hiyassat, and F. F. Al-Hroub, Constr. Innov., vol. 16, no. 4, pp. 446–459, 2016. [CrossRef] [Google Scholar]
- R. H. Ansah and S. Sorooshian, Sustain. Cities Soc., vol. 32, no. December 2016, pp. 348–356, 2017. [CrossRef] [Google Scholar]
- A. H. A. Jamil and M. S. Fathi, Procedia Comput. Sci., vol. 100, pp. 634–643, 2016. [CrossRef] [Google Scholar]
- M. A. Marhani, A. Jaapar, N. A. A. Bari, and M. Zawawi, Procedia - Soc. Behav. Sci., vol. 101, pp. 90–99, 2013. [CrossRef] [Google Scholar]
- A. Sao, S. Singh, S. Dixit, A. K. Pandey, and S. Singh, Int. J. Mech. Eng. Technol., vol. 8, no. 10, 2017. [Google Scholar]
- B. Jørgensen and S. Emmitt, Eng. Constr. Archit. Manag., vol. 15, no. 4, pp. 383–398, 2008. [CrossRef] [Google Scholar]
- M. M. Carvalho and R. Rabechini, Int. J. Proj. Manag., vol. 35, no. 6, pp. 1120–1132, 2017. [CrossRef] [Google Scholar]
- J. Meiling, F. Backlund, and H. Johnsson, Eng. Constr. Archit. Manag., vol. 19, no. 2, pp. 141–158, 2012. [CrossRef] [Google Scholar]
- L. Zhang and X. Chen, Procedia Eng., vol. 145, pp. 1267–1274, 2016. [CrossRef] [Google Scholar]
- M. L. Martens and M. M. Carvalho, “Key factors of sustainability in project management context: A survey exploring the project managers’ perspective,” Int. J. Proj. Manag., vol. 35, no. 6, pp. 1084–1102, 2017. [Google Scholar]
- L. A. Ocampo and E. E. Clark, t Asian Acad. Manag. J., vol. 20, no. 2, pp. 29–57, 2015. [Google Scholar]
- U. Dombrowski and T. Mielke, Procedia CIRP, vol. 17, pp. 565–570, 2014. [CrossRef] [Google Scholar]
- L. M. Khodeir and R. Othman, Ain Shams Eng. J., 2016. [Google Scholar]
- B. Anvari, P. Angeloudis, and W. Y. Ochieng, Autom. Constr., vol. 71, no. Part 2, pp. 226–241, 2016. [Google Scholar]
- M. Ertürk, M. Tuerdi(Maimaitiaili. Tuerdi), and A. Wujiabudula, Procedia - Soc. Behav. Sci., vol. 229, pp. 444–452, 2016. [CrossRef] [Google Scholar]
- P. Dallasega and E. Rauch, Sustainability, vol. 9, no. 10, p. 1888, 2017. [CrossRef] [Google Scholar]
- C. Information, “WOrld a Cademy of SCience, E Ngineering and T Echnology,” p. 2017, 2017. [Google Scholar]
- X. Brioso, Procedia Eng., vol. 123, pp. 85–93, 2015. [CrossRef] [Google Scholar]
- U. H. Issa, Alexandria Eng. J., vol. 52, no. 4, pp. 697–704, 2013. [CrossRef] [Google Scholar]
- Engineers Australia WA Division, Eng. Aust., no. August, 2012. [Google Scholar]
- O. Ametepey, C. Aigbavboa, and K. Ansah, Procedia Manuf., vol. 3, no. Ahfe, pp. 1682–1689, 2015. [CrossRef] [Google Scholar]
- S. Singh, A. Bala, S. Dixit, and D. Varshney, Int. J. Civ. Eng. Technol., vol. 9, no. 1, 2018. [Google Scholar]
- A. K. Pandey, S. Dixit, S. Bansal, S. Saproo, and S. N. Mandal, Int. J. Civ. Eng. Technol., vol. 8, no. 10, 2017. [Google Scholar]
- A. A. Al-Sudairi, Constr. Innov., vol. 7, no. 1, pp. 99–121, 2007. [CrossRef] [Google Scholar]
- E. Lodgaard, J. A. Ingvaldsen, I. Gamme, and S. Aschehoug, Procedia CIRP, vol. 57, pp. 595–600, 2016. [CrossRef] [Google Scholar]
- R. Jiang, C. Wu, C. Mao, and A. Shrestha, Procedia Eng., vol. 145, pp. 436–443, 2016. [CrossRef] [Google Scholar]
- W. Aarseth, T. Ahola, K. Aaltonen, A. Økland, and B. Andersen, Int. J. Proj. Manag., vol. 35, no. 6, pp. 1071–1083, 2017. [CrossRef] [Google Scholar]
- H. Bernstein and S. Jones, vol. 3, no. 2. 2010. [Google Scholar]
- R. F. Aziz and S. M. Hafez, Alexandria Eng. J., vol. 52, no. 4, pp. 679–695, 2013. [CrossRef] [Google Scholar]
- A. Björnfot and Y. Sardén, Proc. 14th Int. Gr. Lean Constr., no. January, pp. 265–277, 2006. [Google Scholar]
- G. Ballard, I. Tommelein, L. Koskela, and G. Howell, Build. value, p. 504, 2002. [Google Scholar]
- J. Kilpatrick, Utah Manuf. Ext. Partnersh., pp. 1–5, 2003. [Google Scholar]
- U. Dombrowski and T. Mielke, Procedia CIRP, vol. 7, pp. 569–574, 2013. [CrossRef] [Google Scholar]
- R. Pamfilie, A. J. P. (Draghici), and M. Draghici, Procedia - Soc. Behav. Sci., vol. 58, pp. 187–196, 2012. [CrossRef] [Google Scholar]
- I. Alhuraish, C. Robledo, and A. Kobi, IFAC-PapersOnLine, vol. 49, no. 12, pp. 59–64, 2016. [CrossRef] [Google Scholar]
- G. A. Howell, Proc. Seventh Annu. Conf. Int. Gr. Lean Constr., pp. 1–10, 1999. [Google Scholar]
- T.C. da, C. Milberg, and K. D. Walsh, Eng. Constr. Archit. Manag., vol. 19, no. 5, pp. 512–525, 2012. [CrossRef] [Google Scholar]
- S. Dixit, S. N. Mandal, A. Sawhney, and S. Singh, Int. J. Civ. Eng. Technol., vol. 8, no. 8, 2017. [Google Scholar]
- S. Dixit, A. K. Pandey, S. N. Mandal, and S. Bansal, Int. J. Civ. Eng. Technol., vol. 8, no. 6, 2017. [Google Scholar]
- K. C. Iyer and K. N. Jha, Int. J. Proj. Manag., vol. 23, no. 4, pp. 283–295, May 2005. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.