Open Access
Issue
MATEC Web Conf.
Volume 170, 2018
International Science Conference SPbWOSCE-2017 “Business Technologies for Sustainable Urban Development”
Article Number 01016
Number of page(s) 6
Section Municipal Facilities Management. Business Activity Management in Construction. Process Reengineering and Information Systems
DOI https://doi.org/10.1051/matecconf/201817001016
Published online 13 June 2018
  1. M.W. Staniewski, R. Nowacki, A. Awruk, K. Int. Entrep. Manag. J. 12, 861 (2016) https://doi.org/10.1007/s11365-016-0385-8 [CrossRef] [Google Scholar]
  2. A. Tezel, L. Koskela, Z. Aziz, LC3 2017 Volume II – Proceedings of the 25th Annual Conference of the International Group for Lean Construction (IGLC), 853–859 (2017) DOI: https://doi.org/10.24928/2017/0328 [Google Scholar]
  3. V. Navickas, A. Malakauskaite, Journal of Business Economics and Management 10-3, 255-259 (2009) https://doi.org/10.3846/1611-1699.2009.10.255-259 [Google Scholar]
  4. F.L. Ribeiro, M.T. Fernandes, Journal of Enterprise Information Management 23-2, 161-180 (2010) https://doi.org/10.1108/17410391011019750 [CrossRef] [Google Scholar]
  5. G. Dragoi, S.M. Rosu, O.-B. Pavaloiu, A. Draghici, Procedia Technology 9, 431 – 441 (2013) [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.