Open Access
Issue |
MATEC Web Conf.
Volume 162, 2018
The 3rd International Conference on Buildings, Construction and Environmental Engineering, BCEE3-2017
|
|
---|---|---|
Article Number | 02036 | |
Number of page(s) | 5 | |
Section | Building Materials Engineering and Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201816202036 | |
Published online | 07 May 2018 |
- Abdelsalam, H.M.E. and Gad>, M.M. International Journal of Project Management 27, 501-511 (2009). [CrossRef] [Google Scholar]
- Schiffauerova, A. and Thomson, V. International Journal of Quality & Reliability Management 23, 647-669 (2006b). [CrossRef] [Google Scholar]
- Hall, M. and Tomkins, C. Construction Management and Economics 19, 727-740 (2001). [CrossRef] [Google Scholar]
- Chang, C. Journal of the Academy of Business and Economics II, 172-187 (2005). [Google Scholar]
- Hansen, D.R. and Mowen, M.M. (Thomson, South-Western, United State of America, 2006). [Google Scholar]
- Feigenbaum, A.V. Total quality control (McGraw-Hill Inc., New York, 1983). [Google Scholar]
- Love, P.E.D. and Irani, Z. Information and Management 40, 649-461 (2003). [CrossRef] [Google Scholar]
- Czuchry, A.J., Yasin, M.M. and Ltle, G.S. Industrial Management & Data Systems 99, 362-366 (1999). [CrossRef] [Google Scholar]
- Al-Tmeemy, S.M.H.M., Abdul-Rahman, H. and Harun, Z. International Journal of Project Management 29, 337-348 (2011). [CrossRef] [Google Scholar]
- Achi, F.O., Onukwube, H.N. and Oluwaseyi M, Atlanta USA, 2007). [Google Scholar]
- Abdul-Rahman, H. Construction Management and Economics 13, 23-32 (1995). [CrossRef] [Google Scholar]
- Alwi, S., Keith, H. and Sherif, M. Asia Pacific Building and Construction Management Journal 6, 2-6 (2001). [Google Scholar]
- Smallwood, J. and Rossouw, J.-H. in (COBRA) (Dublin, Ireland 2008). [Google Scholar]
- Bewick, V., Cheek, L. and Ball, J. Critical Care 7, 451-459 (2003). [CrossRef] [Google Scholar]
- Field, A. Discovering (Sage Publications Ltd, London, 2000). [Google Scholar]
- Kerlinger, F.N. and Lee, H.B. (Harcourt College Publishers, Orlando, 2000). [Google Scholar]
- Tabachnick, B.G. and Fidell, L.S. (Pearson Education Inc., United States of America, 2007). [Google Scholar]
- Hair, J.F., Black, W.C., Babin, B.J. and Anderson, R.E. Multivariate Data Analysis (Pearson Prentice Hall, New Jersey, 2010). [Google Scholar]
- Wang, G.C.S. and Jain, C.L. (Graceway Publishing Company, Inc., New York, 2003). [Google Scholar]
- Akintoye, A. Construction Management and Economics 18, 77-89 (2000). [CrossRef] [Google Scholar]
- Dulaimi, M.F., Ling., F.Y.Y. and Bajracharya, 21, 307-318 (2003). [Google Scholar]
- Crosby, P.B. (McGraw-Hill, New York, 1979). [Google Scholar]
- Kazaz, A., Birgonulb, M.T. and Ulubeylia, S. 40, 1356-1365 (2005). [Google Scholar]
- Low, S.P. and Yeo, H.K.C. International Journal of Quality & Reliability Management 15, 329-349 (1998). [CrossRef] [Google Scholar]
- Abdul-Rahman, H., Thompson, P.A. and Whyte, I.L. International Journal of Quality & Reliability Management 13, 48-60 (1996). [CrossRef] [Google Scholar]
- Winner, R.I., Pennell, J.P., Bertrand, H.E. and Slusarczuk, M.M. (Institute for Defense Analyses, Alexandria, Virginia, 1988). [Google Scholar]
- Chong, W.-K. and Low, S.-P. Journal of Performance of Constructed Facilities 20, 213-221 (2006). [CrossRef] [Google Scholar]
- Campanella, J. and Corcoran, F.J. (ASQC Quality Press, Milwaukee, WI, 1983). [Google Scholar]
- Ittner, C. Operations Research 44, 114-130 (1996). [CrossRef] [Google Scholar]
- Love, P.E.D., Mandal, P. and Li, H. Determining the causal structure of rework in construction projects. Construction Management and Economics 17, 505-517 (1999). [CrossRef] [Google Scholar]
- Abdul-Rahman, H. International Journal of Quality & Reliability Management 14, 464-281 (1997). [CrossRef] [Google Scholar]
- Hendrickson, C. (Prentice Hall, Pittsburgh, 2000). [Google Scholar]
- Aoieong, R.T., Tang, S.L. and Ahmed, S.M. A Construction Management and Economics 20, 179-192 (2002). [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.