Open Access
Issue
MATEC Web of Conferences
Volume 159, 2018
The 2nd International Joint Conference on Advanced Engineering and Technology (IJCAET 2017) and International Symposium on Advanced Mechanical and Power Engineering (ISAMPE 2017)
Article Number 01019
Number of page(s) 6
Section Built Environment
DOI https://doi.org/10.1051/matecconf/201815901019
Published online 30 March 2018
  1. W. S. Andi, Y. Hendarlim, Faktor-Faktor Penyebab Rework pada PekerjaanKonstruksi. Civil Engineering Dimension/CED, 7.1, 22-29 (2005) [Google Scholar]
  2. F. Fakih, Banyak Rusunawa Bocor dan Retak, Ahok akan Hati-Hati Berikan Tender, Retrieved 01 November 2016 from https://www.merdeka.com/jakarta/banyak-rusunawa-bocor-dan-retak-ahok-akan-hati-hati-berikan-tender.html (2016) [Google Scholar]
  3. S. Ponticelli, W. O'Brien, F. Leite, 5th International/11th Construction Specialty Conference, 1-10 (2015) [Google Scholar]
  4. ISO 9001 and Risk, http://isotc.iso.org/, Retrieved 01 October 2016 from http://isotc.iso.org/livelink/livelink/fetch/2000/2122/-8835176/-8835848/8835872/8835883/ISO9001andRisk.docx (2016) [Google Scholar]
  5. O. Zwikael, Critical Planning Processes in Construction Projects, Cons. Innov., 9, 372-387 (2009) [CrossRef] [Google Scholar]
  6. T. Leemann, Managing the Chaos of Change, The J. of Bus. Strategy, 23.5, 11-15 (2002) [CrossRef] [Google Scholar]
  7. K. Blyth, J. Lewis, A. Kaka, Developing Framework for Standardized Work Programme for Building Project, Cons. Innov., 4, 193-210 (2004) [CrossRef] [Google Scholar]
  8. J.V. Tonder, M. Bekker, Analysis of a Methodology to Obtain a Work Breakdown Structure Built Up From Interdependent Key Project Deliverable Packages. AfricanRhythm Project Management Conference. Johannesburg South Africa, 1-13 (2002) [Google Scholar]
  9. B. Atkin, Stereotypes and themes in building designs: insights for model builders, Cons. Mngmt. and Eco., 11, 119-30 (1993) [CrossRef] [Google Scholar]
  10. C. Gray, J. Little, The classification of work packages to determine the relationship between design and construction, Occasional paper No. 18, Department ofConstruction Management and Economics University of Reading (1985) [Google Scholar]
  11. J.M. Nicholas, Project Management for Business and Engineering Principles and Practice (Elsevier, Oxford, 2004) [Google Scholar]
  12. Y.M. Ibrahim, A. Kaka, G. Aouad, M. Kagioglou, Framework for a generic work breakdown structure for building projects, Const. Innovation, 9.4, 388-405 (2009) [CrossRef] [Google Scholar]
  13. S.T. Lai, A WBS-Based Plan Changeability Measurement Model for ReducingSoftware Project Change Risk, Lecture Notes on Software Engineering, 2.1, 94-99 (2014) [CrossRef] [Google Scholar]
  14. L. Su, WBS-based Risk Identification for the Whole Process of Real Estate Project and Countermeasures, National Conference on Information Technology and Computer Science (2012) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.