Open Access
Issue
MATEC Web Conf.
Volume 154, 2018
The 2nd International Conference on Engineering and Technology for Sustainable Development (ICET4SD 2017)
Article Number 01064
Number of page(s) 5
Section Engineering and Technology
DOI https://doi.org/10.1051/matecconf/201815401064
Published online 28 February 2018
  1. Shtub, A. & Cohen, Y., Introduction to Industrial Engineering 2nd Edition, CRC Press, USA, (2016) [CrossRef] [Google Scholar]
  2. Ifra Research, Optimising Productivity in Newspaper, Production Lines, Ifra Special Report 3.33: 01-23, (2001) [Google Scholar]
  3. Esa, M.M., Rahman, N.A.A., Jamaludin, M., Reducing High Setup Time in Assembly Line: A Case Study of Automotive Manufacturing Company in Malaysia, Procedia Social and Behavioral Science, Vol. 211: 215-220, (2015) [CrossRef] [Google Scholar]
  4. Bicheno, J. & Holweg, M., The Lean Toolbox: The Essential Guide to Lean Transformation, Production and Inventory Control, System and Industrial Books, UK, (2009) [Google Scholar]
  5. Mcintosh, R.I., Culley, S.J., Mileham, A.R. Owen, G.W., Improving Changeover Performance: A Strategy for Becoming a Lean, Responsive Manufacturer, Butterworth Heinemann, UK, (2001) [Google Scholar]
  6. Nurtrianto, R., Analisis Dan Perancangan Sistem Informasi Penjadwalan Preventive Maintenance Pada PT Starmas Inti Aluminium Industry, Binus University, Jakarta, (2011) [Google Scholar]
  7. Refrizal & Sudarmadji, H., Aplikasi Metoda SMED Untuk Perbaikan Waktu Proses Ganti Model (Changeover Time) Dan Waktu Penyetelan (Setup Time), Jurnal Me Trik Polban, Vol. 5, No. 02, (2011) [Google Scholar]
  8. Arvianto, A. & Arista, R., Usulan Perbaikan Operation Point Sheet Pada Mesin Feeder Aida 1100 Dengan Menggunakan Metode SMED, J@Ti Undip, Vol VI, No 2: 125-136, (2011) [Google Scholar]
  9. António, C.M & Gil, C.S.P., Single Minute Exchange of Die A Case Study Implementation, Journal of Technology Management Innovation, Vol. 6, Issue 1: 130-146, (2011) [Google Scholar]
  10. Kartik, S.K. & Muhamad, Z.M.S, Integration of SMED and TRIZ in Improving Productivity at Semiconductor Industry, Jurnal Mekanikal. no 33: 40-55, (2011) [Google Scholar]
  11. Novitasari, P.P., Arif, R., Ceria, F.M.T., Perbaikan Waktu Setup Dengan Pendekatan Single Minute Exchange of Dies (SMED) Untuk Mengurangi Unnecessary Motion Waste, Jurnal Rekayasa dan Manajemen Sistem Industri, Vol. 1. No. 1: 1-10. (2013) [Google Scholar]
  12. Rahul, R. J. & Naik, G.R., Application Of Smed Methodology-A Case Study In Small Scale Industry, International Journal of Scientific and Research Publications, Vol. 2, Issue 8: 2250-3153, (2012) [Google Scholar]
  13. Saputra, F. & Widyadana, I.G.A., Penurunan Waste Proses Produksi Produk RJK Di Departemen DEW PT. X Dengan Value Stream Mapping, Jurnal Tirta, Vol 1. No.2 :233-240, (2013) [Google Scholar]
  14. Abdul, W.N., Surachman., Nasir, W.S., & Rudi, S., Implementasi Konsep Lean Manufacturing Untuk Meminimalkan Waktu Keterlambatan Penyelesaian Produk ”A” Sebagai Value Pelanggan Studi Kasus PT TSW (Tuban Steel Work), Jurnal Rekayasa Mesin, Vol.4: 147-156, (2013) [Google Scholar]
  15. Indrawati, S. & Ridwansyah, M., Manufacturing Performance Improvement Through Lean Six Sigma Method: An Iron Ores Industry Case Application, Procedia Manufacturing, Vol 4: 528-534, (2015) [CrossRef] [Google Scholar]
  16. Shingo, S. A., Revolution in Manufacturing: The SMED System. Productivity Press, Cambridge, (1983) [Google Scholar]
  17. Dave, Y. & Sohani, N., Single Minute Exchange of Dies, Journal of Lean Thinking, Vol. 3, Issue 2: 27-37, (2012) [Google Scholar]
  18. Rother, M. & Shook, J., Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA, Lean Enterprise Institute Inc., USA, (2009) [Google Scholar]
  19. Ulutas, B., An Application of SMED Methodology, World Academy of Science, Engineering and Technology, Vol 79: 100-103, (2011) [Google Scholar]
  20. Raikar, N.A., Reduction in Setup Time by SMED Methodology: A Case Study, International Journal of Latest Trends in Engineering and Technology, Vol.5, Issue 4: 56-60, (2015) [Google Scholar]
  21. Kusar, J., Berlec, T., Zefran, F., Starbek, M., Reduction of Machine Setup Time, Journal of Mechanical Engineering, Vol. 56, Issue 12: 833-845, (2010) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.