Open Access
Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 05037 | |
Number of page(s) | 8 | |
Section | Management in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825105037 | |
Published online | 14 December 2018 |
- P. Oleinik, A. Yurgaytis, Optimization of the annual construction program solutions (MATEC Web of Conferences, 117, 2017) [Google Scholar]
- Dmitriy Topchiy, Anastasia Shatrova, Alexey Yurgaytis, Integrated construction supervision as a tool to reduce the developer’s risks when implementing new and redevelopment projects (MATEC Web of Conferences, 193, 2018) [Google Scholar]
- P. Oleinik, A. Yurgaytis, The method of forming solutions for non-critical activities in the preparation and optimization of the construction complex organizations’ annual program (MATEC Web of Conferences 193, 2018) [Google Scholar]
- M. Rogalska, W. Bozejko, Z. Hejducki, Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (Automation in Construction, 2008) [Google Scholar]
- W. Bozejko, Z. Hejducki, M. Uchroński, M. Wodecki, Solving resource-constrained construction scheduling problems with overlaps by metaheuristic (Journal of Civil Engineering and Management, 2014) [Google Scholar]
- W. Bozejko, Z. Hejducki, M. Wodecki Applying metaheuristic strategies in construction projects management (Journal of Civil Engineering and Management, 2012) [Google Scholar]
- M. Rogalska, W. Bozejko, Z. Hejducki, M. Wodecki, Development of time couplings method using evolutionary algorithms (ISARC 2008 Proceedings from the 25th International Symposium on Automation and Robotics in Construction, 2008) [Google Scholar]
- M. Rogalska, Z. Hejducki, Time buffers in construction process scheduling (Journal of Civil Engineering and Management, 2007) [Google Scholar]
- Z. Hejducki, M. Rogalska, Shortening the realisation time of building projects with application of theory of constraints and critical chain scheduling (Journal of Civil Engineering and Management, 2005) [Google Scholar]
- Z. Hejducki, Sequencing problems in methods of organizing construction processes (Engineering, Construction and Architectural Management, 2004) [Google Scholar]
- Z. Hejducki, Scheduling model of construction activity with time couplings (Journal of Civil Engineering and Management, 2003) [Google Scholar]
- Z. Hejducki, J. Mrozowicz, Stream methods of construction work organization: An introduction to the problem (Engineering, Construction and Architectural Management, 2001) [Google Scholar]
- S.H. Han, M. Al-Hussein, S. Al-Jibouri, H. Yu, Automated post-simulation visualization of modular building production assembly line, Autom. Constr. 21 (2012) [Google Scholar]
- H. Taghaddos, U. Hermann, S. AbouRizk, Y. Mohamed, Simulation-based multiagent approach for scheduling modular construction, (J. Comput. Civ. Eng. 28, 2012) [Google Scholar]
- P.Y. Hsu, M. Aurisicchio, P. Angeloudis, Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity (International Conference on Computational Logistics 2017, Southampton, UK, October 18–20, 2017) [Google Scholar]
- P.Y. Hsu, M. Aurisicchio, P. Angeloudis, Investigating schedule deviation in construction projects through root cause analysis, (Proc. Comput. Sci. 121, 2017) [Google Scholar]
- Albert Ponsteena, Rob J. Kusters Classification of Humanand Automated Resource Allocation Approaches in Multi-Project Management (Procedia Social and Behavioral Sciences 194, 2015) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.