Open Access
Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 05023 | |
Number of page(s) | 8 | |
Section | Management in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825105023 | |
Published online | 14 December 2018 |
- Government of the Russian Federation. Federal Law No. 273-FZ “On Education in the Russian Federation” (2012, edited in 2016) [Google Scholar]
- Government of the Russian Federation. Svod Pravil 251.1325800.2016 “Zdaniya obsheobrazovatelnych organizacii. Pravila proectirovaniya” [Set of Rules 251.1325800.2016 “Educational institution buildings. Design rules”] (2016) [Google Scholar]
- Government of the Russian Federation. Svod Pravil 63.13330.2012 “Betonnye i zhelezobetonnye konstrukzii. Osnovnye polozheniya” [Set of Rules 63.13330.2012 “Concrete and won concrete construction. Design requirements”] (2012) [Google Scholar]
- Government of the Russian Federation. Decree No. 1521 (26 Dec. 2014) [Google Scholar]
- Government of the Russian Federation. Svod Pravil 118.13330.2012 “Obschestvennye zdaniya i sooruzheniya” [Set of Rules 118.13330.2012 “Public buildings and works”] (2012) [Google Scholar]
- Approved by the Chief State Sanitary Doctor of the Russian Federation. Sanitarnye pravila i normy 2.4.2.2821-10 “Sanitarno-epidemiologicheskie trebovanya k usloviam i organizacii obucheniya v obsheobrazovatelnych uchrezhdeniyach” [Sanitary rules and norms 2.4.2.2821-10 “Sanitary and epidemiological requirements for the conditions and organization of education in general education institutions”] (2010, edited in 2015) [Google Scholar]
- Approved by the Chief State Sanitary Doctor of the Russian Federation. Sanitarnye pravila i normy 2.2.1/2.1.1.1278-03 “Sanitarno-epidemiologicheskie trebovanya k usloviam i organizacii obucheniya v obsheobrazovatelnych uchrezhdeniyach” [Sanitary rules and norms 2.2.1/2.1.1.1278-03 “Sanitary and epidemiological requirements for the conditions and organization of education in general education institutions”] (2010, edited in 2015) [Google Scholar]
- Oleinik P. Yurgaytis A. Optimization of the annual construction program solutions. MATEC Web of Conferences. 2017. Volume 117. Article Number 00130. RSP 2017 – XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineer-ing https://doi.org/10.1051/matecconf/201711700130 (2017) [Google Scholar]
- Topchiy D.V., Scacalov V.A., Yurgaytis A. Comprehensive verification construction compliance control as the Developer’s project risk reduction tool. International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 1, January 2018, pp. 985–993 http://http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=9&IType=1 (2018) [Google Scholar]
- Dmitriy Topchiy, Anastasia Shatrova and Alexey Yurgaytis. Integrated construction supervision as a tool to reduce the developer’s risks when implementing new and rede-velopment projects. MATEC Web of Conferences 193, 05032 (2018), ESCI 2018, https://doi.org/10.1051/matecconf/201819305032 (2018) [Google Scholar]
- Oleinik P., Yurgaytis A. The method of forming solutions for non-critical activities in the preparation and optimization of the construction complex organizations’ annual pro-gram , MATEC Web of Conferences 193, 05010 (2018), ESCI 2018, https://doi.org/10.1051/matecconf/201819305010 [Google Scholar]
- M. Rogalska, W. Bozejko, Z. Hejducki. Time/cost optimization using hybrid evolution-ary algorithm in construction project scheduling, Automation in Construction (2008) [Google Scholar]
- Bozejko, W., Hejducki, Z., Uchroński, M., Wodecki, M. Solving resource-constrained construction scheduling problems with overlaps by metaheuristic. Journal of Civil En-gineering and Management (2014) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.